IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,152

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0054 # 06 Y:1982 06 1982 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,360 $0 Not Implemented
KU0055 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $311 $520 Implemented
KU0055 # 02 Y:1982 02 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $28,915 $1,400 Not Implemented
KU0055 # 03 Y:1982 03 1982 KEEP SOLID FUELS / RAW MATERIALS DRY $14,171 $0 Not Implemented
KU0055 # 04 Y:1982 04 1982 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $15,482 $500 Implemented
KU0055 # 05 Y:1982 05 1982 OPTIMIZE PLANT POWER FACTOR $2,061 $1,800 Implemented
KU0055 # 06 Y:1982 06 1982 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $66,400 $240,000 Not Implemented
OK0037 # 01 Y:1982 01 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,854 $300 Not Implemented
OK0037 # 02 Y:1982 02 1982 INSTALL TIMERS AND/OR THERMOSTATS $1,647 $552 Not Implemented
OK0037 # 03 Y:1982 03 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $749 $1,484 Not Implemented
OK0037 # 04 Y:1982 04 1982 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $43 $125 Not Implemented
OK0038 # 01 Y:1982 01 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $217 $313 Not Implemented
OK0038 # 02 Y:1982 02 1982 USE RADIANT HEATER FOR SPOT HEATING $23,027 $29,970 Not Implemented
OK0038 # 03 Y:1982 03 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $259 $165 Not Implemented
OK0038 # 04 Y:1982 04 1982 INSTALL STORM WINDOWS AND DOORS $4,750 $17,358 Not Implemented
OK0040 # 01 Y:1982 01 1982 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $3,020 $2,680 Implemented
OK0040 # 02 Y:1982 02 1982 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $1,682 $4,000 Implemented
OK0040 # 03 Y:1982 03 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,994 $922 Implemented
OK0040 # 04 Y:1982 04 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $360 $15 Implemented
OK0045 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $150 $147 Not Implemented
OK0045 # 04 Y:1982 04 1982 INSTALL TIMERS AND/OR THERMOSTATS $67 $200 Not Implemented
OK0045 # 05 Y:1982 05 1982 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $519 $1,434 Not Implemented
OK0045 # 06 Y:1982 06 1982 RECOVER WASTE HEAT FROM EQUIPMENT $489 $345 Not Implemented
OK0045 # 07 Y:1982 07 1982 OPTIMIZE PLANT POWER FACTOR $1,161 $1,260 Not Implemented
OK0050 # 01 Y:1982 01 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,801 $180 Not Implemented