Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,602
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KG0069 # 14 Y:1996 | 14 | 1996 | RECYCLE WHITE WATER | $12,464 | $2,930 | Implemented |
KG0069 # 15 Y:1996 | 15 | 1996 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $177,789 | $30,000 | Implemented |
KG0068 # 01 Y:1996 | 01 | 1996 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $7,700 | $60 | Implemented |
KG0068 # 02 Y:1996 | 02 | 1996 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $5,738 | $250 | Not Implemented |
KG0068 # 03 Y:1996 | 03 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,180 | $2,767 | Implemented |
KG0068 # 04 Y:1996 | 04 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,022 | $12,000 | Not Implemented |
KG0068 # 05 Y:1996 | 05 | 1996 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $2,738 | $5,000 | Implemented |
KG0068 # 06 Y:1996 | 06 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,578 | $12 | Implemented |
KG0068 # 07 Y:1996 | 07 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $771 | $1,800 | Implemented |
KG0068 # 08 Y:1996 | 08 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $758 | $2,490 | Implemented |
KG0068 # 09 Y:1996 | 09 | 1996 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $491 | $920 | Implemented |
KG0068 # 10 Y:1996 | 10 | 1996 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $12,707 | $5,023 | Implemented |
KG0067 # 01 Y:1996 | 01 | 1996 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $201,031 | $1,200,000 | Not Implemented |
KG0067 # 02 Y:1996 | 02 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,732 | $9,920 | Implemented |
KG0067 # 03 Y:1996 | 03 | 1996 | INSTALL TIMERS AND/OR THERMOSTATS | $1,761 | $600 | Implemented |
KG0067 # 04 Y:1996 | 04 | 1996 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,166 | $2,275 | Not Implemented |
KG0067 # 05 Y:1996 | 05 | 1996 | AIR CONDITION ONLY SPACE NECESSARY | $987 | $0 | Implemented |
KG0067 # 06 Y:1996 | 06 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,396 | $482 | Implemented |
KG0067 # 07 Y:1996 | 07 | 1996 | MINIMIZE WATER USAGE | $12,749 | $1,904 | Implemented |
KG0067 # 08 Y:1996 | 08 | 1996 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $1,723 | $425 | Implemented |
KG0067 # 09 Y:1996 | 09 | 1996 | RECOVER AND REUSE WASTE MATERIAL | $2,356 | $500 | Implemented |
AM0281 # 01 Y:1996 | 01 | 1996 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $95,600 | $1,500 | Implemented |
AM0281 # 02 Y:1996 | 02 | 1996 | OPTIMIZE PLANT POWER FACTOR | $14,320 | $14,320 | Not Implemented |
AM0281 # 03 Y:1996 | 03 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $150 | $180 | Not Implemented |
AM0281 # 04 Y:1996 | 04 | 1996 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,250 | $2,370 | Implemented |