IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,682

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0026 # 03 Y:1995 03 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $507 $20 Implemented
BD0026 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $212 $200 Not Implemented
BD0026 # 05 Y:1995 05 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,388 $60 Not Implemented
BD0026 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $265 $95 Not Implemented
BD0025 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,949 $12,980 Implemented
BD0025 # 02 Y:1995 02 1995 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $4,321 $8,450 Not Implemented
BD0025 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,253 $400 Implemented
BD0025 # 04 Y:1995 04 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,558 $60 Implemented
BD0025 # 05 Y:1995 05 1995 RECOVER WASTE HEAT FROM EQUIPMENT $4,840 $2,500 Implemented
BD0025 # 06 Y:1995 06 1995 INSTALL OCCUPANCY SENSORS $2,685 $1,050 Implemented
BD0025 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,086 $712 Implemented
WI0232 # 01 Y:1995 01 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,507 $500 Not Implemented
WI0232 # 02 Y:1995 02 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,343 $10,000 Not Implemented
WI0232 # 03 Y:1995 03 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,427 $20 Not Implemented
WI0232 # 04 Y:1995 04 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,004 $0 Not Implemented
WI0232 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,246 $1,805 Not Implemented
WI0232 # 06 Y:1995 06 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $188 $0 Not Implemented
WI0232 # 07 Y:1995 07 1995 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $401 $260 Not Implemented
WI0232 # 08 Y:1995 08 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $244 $640 Not Implemented
WI0232 # 09 Y:1995 09 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $139 $0 Not Implemented
BD0024 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,242 $3,430 Implemented
BD0024 # 02 Y:1995 02 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $333 $20 Implemented
BD0024 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $246 $160 Not Implemented
BD0024 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $997 $1,531 Not Implemented
WI0235 # 01 Y:1995 01 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,074 $13,000 Not Implemented