IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

84,208

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0044 # 02 Y:2002 02 2002 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $39,270 $28,000 Not Implemented
MI0044 # 03 Y:2002 03 2002 INSTALL BACK-UP EQUIPMENT $12,320 $2,534 Not Implemented
MI0044 # 04 Y:2002 04 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,885 $750 Not Implemented
MI0044 # 05 Y:2002 05 2002 ELIMINATE/REDUCE AN OPERATION $2,410 $48 Not Implemented
MI0044 # 06 Y:2002 06 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,072 $6,848 Not Implemented
MI0044 # 07 Y:2002 07 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,746 $1 Not Implemented
MA0515 # 01 Y:2002 01 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,976 $0 Implemented
MA0515 # 02 Y:2002 02 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,745 $4,805 Implemented
MA0515 # 03 Y:2002 03 2002 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,060 $0 Not Implemented
MA0515 # 04 Y:2002 04 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $717 $0 Implemented
IA0292 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,757 $1,256 Implemented
IA0292 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,700 $264 Implemented
IA0292 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,277 $688 Not Implemented
IA0292 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $347 $509 Not Implemented
IA0292 # 05 Y:2002 05 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $133,875 $21,450 Not Implemented
IA0292 # 06 Y:2002 06 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,372 $5,765 Not Implemented
LL0145 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,490 $1,350 Implemented
LL0145 # 02 Y:2002 02 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,323 $0 Implemented
LL0145 # 03 Y:2002 03 2002 OPTIMIZE PLANT POWER FACTOR $5,861 $6,125 Implemented
LL0145 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $486 $104 Implemented
LL0145 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $93 $112 Not Implemented
LL0145 # 06 Y:2002 06 2002 INSTALL OCCUPANCY SENSORS $46 $28 Not Implemented
WI0425 # 01 Y:2002 01 2002 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $58,500 $120,000 n/a
WI0425 # 02 Y:2002 02 2002 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $11,400 $2,000 n/a
WI0425 # 03 Y:2002 03 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,750 $4,800 n/a