Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
80
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0023 # 03 Y:1981 | 03 | 1981 | RECOVER WASTE HEAT FROM EQUIPMENT | $810 | $2,100 | Not Implemented |
KU0023 # 04 Y:1981 | 04 | 1981 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $77 | $0 | Not Implemented |
KU0023 # 07 Y:1981 | 07 | 1981 | RECOVER WASTE HEAT FROM EQUIPMENT | $232 | $950 | Not Implemented |
KU0023 # 05 Y:1981 | 05 | 1981 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $730 | $200 | Not Implemented |
KU0023 # 06 Y:1981 | 06 | 1981 | PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT | $374 | $1,280 | Not Implemented |
KU0017 # 05 Y:1981 | 05 | 1981 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,396 | $19,385 | Not Implemented |
KU0016 # 02 Y:1981 | 02 | 1981 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $748 | $928 | Implemented |
KU0017 # 04 Y:1981 | 04 | 1981 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,272 | $1,000 | Implemented |
KU0017 # 03 Y:1981 | 03 | 1981 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,230 | $2,000 | Implemented |
KU0017 # 02 Y:1981 | 02 | 1981 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,749 | $0 | Implemented |
KU0017 # 01 Y:1981 | 01 | 1981 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,038 | $4,000 | Implemented |
KU0016 # 06 Y:1981 | 06 | 1981 | INSULATE BARE EQUIPMENT | $792 | $700 | Not Implemented |
KU0016 # 05 Y:1981 | 05 | 1981 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $180 | $450 | Not Implemented |
KU0016 # 04 Y:1981 | 04 | 1981 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $2,861 | $1,500 | Not Implemented |
KU0016 # 03 Y:1981 | 03 | 1981 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $15,275 | $39,000 | Implemented |
KU0017 # 06 Y:1981 | 06 | 1981 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,358 | $746 | Implemented |
KU0017 # 07 Y:1981 | 07 | 1981 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,477 | $0 | Implemented |
KU0018 # 01 Y:1981 | 01 | 1981 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,659 | $0 | Implemented |
KU0018 # 02 Y:1981 | 02 | 1981 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $1,039 | $1,600 | Implemented |
KU0018 # 03 Y:1981 | 03 | 1981 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $495 | $0 | Not Implemented |
KU0018 # 04 Y:1981 | 04 | 1981 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $518 | $1,020 | Implemented |
KU0020 # 01 Y:1981 | 01 | 1981 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,611 | $638 | Not Implemented |
KU0020 # 02 Y:1981 | 02 | 1981 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,161 | $260 | Not Implemented |
KU0020 # 03 Y:1981 | 03 | 1981 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $34 | $132 | Not Implemented |
KU0021 # 01 Y:1981 | 01 | 1981 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,455 | $4,149 | Implemented |