Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0523 # 02 Y:1997 | 02 | 1997 | REVISE RAW MATERIAL SPECS | $203,890 | $100,000 | Implemented |
UD0523 # 03 Y:1997 | 03 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,766 | $4,000 | Not Implemented |
UD0523 # 04 Y:1997 | 04 | 1997 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,323 | $0 | Not Implemented |
UD0523 # 05 Y:1997 | 05 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,484 | $16,515 | Not Implemented |
UD0521 # 01 Y:1997 | 01 | 1997 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $7,099 | $0 | Implemented |
UD0521 # 02 Y:1997 | 02 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $630 | $100 | Implemented |
UD0521 # 03 Y:1997 | 03 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $868 | $1,000 | Implemented |
UD0521 # 04 Y:1997 | 04 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $657 | $1,764 | Not Implemented |
UD0521 # 05 Y:1997 | 05 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,098 | $2,828 | Not Implemented |
UD0521 # 06 Y:1997 | 06 | 1997 | UPGRADE OBSOLETE EQUIPMENT | $1,123 | $1,000 | Implemented |
UD0520 # 01 Y:1997 | 01 | 1997 | USE EVAPORATION TO CONCENTRATE MATERIAL | $5,304 | $14,840 | Not Implemented |
UD0520 # 02 Y:1997 | 02 | 1997 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $12,472 | $24,000 | Not Implemented |
UD0520 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,380 | $17,325 | Implemented |
UD0520 # 04 Y:1997 | 04 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,791 | $3,843 | Not Implemented |
UD0520 # 05 Y:1997 | 05 | 1997 | INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM | $26,134 | $0 | Implemented |
UD0520 # 06 Y:1997 | 06 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,769 | $80 | Implemented |
UD0519 # 01 Y:1997 | 01 | 1997 | USE GRAVITY FEEDS WHEREVER POSSIBLE | $9,099 | $5,828 | Implemented |
UD0519 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $557 | $1,915 | Implemented |
UD0519 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $453 | $888 | Implemented |
UD0519 # 04 Y:1997 | 04 | 1997 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $811 | $0 | Implemented |
UD0519 # 05 Y:1997 | 05 | 1997 | INSTALL EQUIPMENT TO MOVE PRODUCT | $14,413 | $6,000 | Implemented |
WV0119 # 01 Y:1997 | 01 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,645 | $5,151 | Not Implemented |
WV0119 # 02 Y:1997 | 02 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,860 | $345 | Implemented |
WV0119 # 03 Y:1997 | 03 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,490 | $350 | Implemented |
WV0119 # 04 Y:1997 | 04 | 1997 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,575 | $5,757 | Not Implemented |