Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,152
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0121 # 01 Y:1982 | 01 | 1982 | AIR CONDITION ONLY SPACE NECESSARY | $6,710 | $2,169 | Not Implemented |
GT0121 # 02 Y:1982 | 02 | 1982 | INSTALL TIMERS AND/OR THERMOSTATS | $6,280 | $2,000 | Implemented |
GT0121 # 03 Y:1982 | 03 | 1982 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,493 | $5,400 | Not Implemented |
GT0121 # 04 Y:1982 | 04 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,683 | $762 | Not Implemented |
GT0121 # 05 Y:1982 | 05 | 1982 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,259 | $7,860 | Not Implemented |
KU0046 # 01 Y:1982 | 01 | 1982 | INSTALL TIMERS AND/OR THERMOSTATS | $2,017 | $0 | Not Implemented |
KU0046 # 02 Y:1982 | 02 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $831 | $1,852 | Implemented |
KU0046 # 03 Y:1982 | 03 | 1982 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $266 | $393 | Implemented |
KU0046 # 04 Y:1982 | 04 | 1982 | PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT | $260 | $480 | Implemented |
KU0046 # 05 Y:1982 | 05 | 1982 | INSTALL STORM WINDOWS AND DOORS | $51 | $286 | Implemented |
UD0031 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,292 | $228 | Not Implemented |
UD0031 # 02 Y:1982 | 02 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $256 | $0 | Implemented |
UD0031 # 03 Y:1982 | 03 | 1982 | REDUCE VENTILATION AIR | $2,422 | $40 | Not Implemented |
UD0031 # 04 Y:1982 | 04 | 1982 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,678 | $1,000 | Not Implemented |
UD0034 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,098 | $2,149 | Not Implemented |
UD0034 # 02 Y:1982 | 02 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $851 | $0 | Implemented |
UD0034 # 03 Y:1982 | 03 | 1982 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $252 | $100 | Not Implemented |
UD0034 # 04 Y:1982 | 04 | 1982 | REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS | $46,072 | $120,000 | Not Implemented |
UD0034 # 05 Y:1982 | 05 | 1982 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $761 | $400 | Not Implemented |
UD0035 # 01 Y:1982 | 01 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $70 | $150 | Implemented |
UD0035 # 02 Y:1982 | 02 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $938 | $258 | Implemented |
UD0035 # 03 Y:1982 | 03 | 1982 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $4,933 | $2,000 | Not Implemented |
UD0035 # 04 Y:1982 | 04 | 1982 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,768 | $1,700 | Implemented |
UD0035 # 05 Y:1982 | 05 | 1982 | REDUCE VENTILATION AIR | $180 | $150 | Not Implemented |
UD0036 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,160 | $3,500 | Not Implemented |