IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143,647

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CC0020 # 01 Y:2023 01 2023 PAY UTILITY BILLS ON TIME $4,526 $0 n/a
CC0020 # 02 Y:2023 02 2023 INSULATE FEEDWATER TANK $905 $1,622 n/a
CC0020 # 03 Y:2023 03 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $2,402 $3,033 n/a
CC0020 # 04 Y:2023 04 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $31,379 $0 n/a
CC0020 # 05 Y:2023 05 2023 UPGRADE CONTROLS ON COMPRESSORS $54,767 $200,000 n/a
CC0020 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,812 $19,750 n/a
CC0020 # 07 Y:2023 07 2023 RECOVER WASTE HEAT FROM EQUIPMENT $23,819 $15,000 n/a
CC0020 # 08 Y:2023 08 2023 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $17,389 $200,000 n/a
CC0020 # 09 Y:2023 09 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,381 $0 n/a
CC0020 # 10 Y:2023 10 2023 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,194 $0 n/a
CC0020 # 11 Y:2023 11 2023 REPAIR OR REPLACE STEAM TRAPS $4,104 $6,050 n/a
CC0020 # 12 Y:2023 12 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $340 $418 n/a
GT0972 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,131 $1,850 Implemented
GT0972 # 02 Y:2024 02 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $17,324 $2,600 Not Implemented
GT0972 # 03 Y:2024 03 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,730 $400 Implemented
GT0972 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,356 $8,492 Not Implemented
GT0972 # 05 Y:2024 05 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $94,441 $1,518,653 Not Implemented
LS0124 # 01 Y:2024 01 2024 LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD $12,447 $6,930 Not Implemented
LS0124 # 02 Y:2024 02 2024 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $24,894 $59,475 Not Implemented
LS0124 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,107 $3,300 Implemented
SU0542 # 01 Y:2023 01 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,088 $0 Not Implemented
SU0542 # 02 Y:2023 02 2023 RECOVER WASTE HEAT FROM EQUIPMENT $5,596 $390 Not Implemented
SU0542 # 03 Y:2023 03 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $651 $85 Implemented
SU0542 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,404 $1,750 Implemented
SU0542 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,343 $4,218 Implemented