IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0089 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,789 $11,754 Implemented
IP0089 # 08 Y:2017 08 2017 USE EXISTING DAM TO GENERATE ELECTRICITY $1,432 $3,507 Not Implemented
IP0089 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $60 $264 Not Implemented
IP0089 # 10 Y:2017 10 2017 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $1,079 $5,047 Implemented
AM0737 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,800 $35,500 Implemented
AM0737 # 02 Y:2017 02 2017 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $18,400 $0 Implemented
AM0737 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $10,300 $1,940 Not Implemented
AM0737 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,610 $120 Not Implemented
AM0737 # 05 Y:2017 05 2017 OPTIMIZE PLANT POWER FACTOR $4,070 $6,200 Not Implemented
AM0737 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,360 $710 Implemented
AM0737 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,210 $3,600 Implemented
AM0737 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $830 $2,000 Implemented
AM0737 # 09 Y:2017 09 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $590 $475 Not Implemented
BS0106 # 01 Y:2017 01 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $374 $275 Implemented
BS0106 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $185 $48 Implemented
BS0106 # 03 Y:2017 03 2017 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,159 $710 Implemented
UD0974 # 01 Y:2017 01 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $31,690 $0 Not Implemented
UD0974 # 02 Y:2017 02 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,184 $0 Not Implemented
UD0974 # 03 Y:2017 03 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,021 $0 Not Implemented
UD0974 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,968 $7,125 Not Implemented
OR0691 # 01 Y:2017 01 2017 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $220,769 $39,442 Not Implemented
OR0691 # 02 Y:2017 02 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,762 $1,200 Implemented
OR0691 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $772 $4,048 Not Implemented
OR0691 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $955 $1,955 Implemented
TT0197 # 01 Y:2017 01 2017 USE SOLAR HEAT TO MAKE ELECTRICTY $19,976 $72,881 Not Implemented