Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,380
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0291 # 08 Y:1989 | 08 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $295 | $650 | Not Implemented |
KU0292 # 01 Y:1989 | 01 | 1989 | INSTALL TIMERS AND/OR THERMOSTATS | $10,146 | $800 | Implemented |
KU0292 # 02 Y:1989 | 02 | 1989 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $751 | $700 | Not Implemented |
KU0292 # 03 Y:1989 | 03 | 1989 | PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT | $591 | $1,350 | Not Implemented |
KU0292 # 04 Y:1989 | 04 | 1989 | INSTALL SET-BACK TIMERS | $3,496 | $1,000 | Implemented |
KU0292 # 05 Y:1989 | 05 | 1989 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $167 | $120 | Implemented |
KU0292 # 06 Y:1989 | 06 | 1989 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,284 | $3,144 | Not Implemented |
MA0155 # 01 Y:1989 | 01 | 1989 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,473 | $0 | Implemented |
MA0155 # 02 Y:1989 | 02 | 1989 | TURN OFF EQUIPMENT WHEN NOT IN USE | $14,248 | $11,775 | Implemented |
MA0155 # 03 Y:1989 | 03 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,948 | $0 | Implemented |
MA0157 # 01 Y:1989 | 01 | 1989 | INSTALL SET-BACK TIMERS | $363 | $175 | Not Implemented |
MA0157 # 02 Y:1989 | 02 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,976 | $466 | Implemented |
MA0157 # 03 Y:1989 | 03 | 1989 | DE-ENERGIZE EXCESS TRANSFORMER CAPACITY | $545 | $584 | Not Implemented |
MA0157 # 04 Y:1989 | 04 | 1989 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $3,203 | $6,025 | Not Implemented |
MA0157 # 05 Y:1989 | 05 | 1989 | TURN OFF EQUIPMENT WHEN NOT IN USE | $106 | $0 | Implemented |
AM0071 # 01 Y:1989 | 01 | 1989 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $11,470 | $50,000 | Implemented |
AM0071 # 02 Y:1989 | 02 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,325 | $1,000 | Implemented |
AM0071 # 03 Y:1989 | 03 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,730 | $6,030 | Implemented |
AM0071 # 04 Y:1989 | 04 | 1989 | KEEP LAMPS AND REFLECTORS CLEAN | $1,855 | $6,900 | Implemented |
AM0071 # 05 Y:1989 | 05 | 1989 | USE OPTIMUM THICKNESS INSULATION | $870 | $145 | Implemented |
AM0071 # 06 Y:1989 | 06 | 1989 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $245 | $1,000 | Not Implemented |
AM0071 # 07 Y:1989 | 07 | 1989 | INSTALL SET-BACK TIMERS | $220 | $0 | Implemented |
OR0061 # 01 Y:1989 | 01 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $958 | $500 | Implemented |
OR0061 # 02 Y:1989 | 02 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,246 | $900 | Implemented |
OR0061 # 03 Y:1989 | 03 | 1989 | OPTIMIZE PLANT POWER FACTOR | $4,155 | $2,000 | Implemented |