Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ND0020 # 05 Y:1992 | 05 | 1992 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $232 | $300 | Implemented |
ND0020 # 06 Y:1992 | 06 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $223 | $400 | Implemented |
ND0020 # 07 Y:1992 | 07 | 1992 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $101 | $0 | Not Implemented |
UD0361 # 01 Y:1992 | 01 | 1992 | OPTIMIZE PLANT POWER FACTOR | $4,347 | $6,000 | Implemented |
UD0361 # 02 Y:1992 | 02 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,671 | $2,800 | Not Implemented |
UD0361 # 03 Y:1992 | 03 | 1992 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,024 | $100 | Not Implemented |
UD0361 # 04 Y:1992 | 04 | 1992 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $4,283 | $7,500 | Not Implemented |
UD0361 # 05 Y:1992 | 05 | 1992 | RECOVER WASTE HEAT FROM EQUIPMENT | $639 | $2,500 | Implemented |
UD0362 # 01 Y:1992 | 01 | 1992 | OPTIMIZE PLANT POWER FACTOR | $500 | $1,500 | Implemented |
UD0362 # 02 Y:1992 | 02 | 1992 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $810 | $0 | Not Implemented |
UD0362 # 03 Y:1992 | 03 | 1992 | INSTALL SET-BACK TIMERS | $952 | $0 | Implemented |
UD0362 # 04 Y:1992 | 04 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,720 | $8,620 | Not Implemented |
UD0363 # 01 Y:1992 | 01 | 1992 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,743 | $40,000 | Implemented |
UD0363 # 02 Y:1992 | 02 | 1992 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $955 | $240 | Implemented |
UD0363 # 03 Y:1992 | 03 | 1992 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $440 | $0 | Implemented |
UD0364 # 01 Y:1992 | 01 | 1992 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $8,100 | $20,000 | Not Implemented |
UD0364 # 02 Y:1992 | 02 | 1992 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $9,728 | $3,200 | Not Implemented |
UD0364 # 03 Y:1992 | 03 | 1992 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $18,314 | $90,000 | Not Implemented |
UD0364 # 04 Y:1992 | 04 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,121 | $14,430 | Implemented |
UD0358 # 01 Y:1991 | 01 | 1991 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $10,464 | $7,000 | Implemented |
UD0358 # 02 Y:1991 | 02 | 1991 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $675 | $0 | Implemented |
UD0358 # 03 Y:1991 | 03 | 1991 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $2,145 | $200 | Implemented |
UD0358 # 04 Y:1991 | 04 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,170 | $0 | Implemented |
UD0358 # 05 Y:1991 | 05 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,636 | $0 | Implemented |
UD0358 # 06 Y:1991 | 06 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $959 | $0 | Implemented |