Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0309 # 05 Y:1990 | 05 | 1990 | INSTALL SET-BACK TIMERS | $900 | $500 | Not Implemented |
UD0309 # 06 Y:1990 | 06 | 1990 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $8,028 | $10,000 | Implemented |
UD0310 # 01 Y:1990 | 01 | 1990 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,258 | $0 | Not Implemented |
UD0310 # 02 Y:1990 | 02 | 1990 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $862 | $0 | Implemented |
UD0310 # 03 Y:1990 | 03 | 1990 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $170 | $0 | Implemented |
UD0310 # 04 Y:1990 | 04 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,326 | $442 | Implemented |
UD0310 # 05 Y:1990 | 05 | 1990 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $907 | $1,800 | Implemented |
UD0310 # 06 Y:1990 | 06 | 1990 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $4,867 | $25,000 | Not Implemented |
UD0307 # 01 Y:1990 | 01 | 1990 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $4,728 | $100 | Implemented |
UD0307 # 02 Y:1990 | 02 | 1990 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $140 | $200 | Not Implemented |
UD0307 # 03 Y:1990 | 03 | 1990 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $721 | $1,425 | Not Implemented |
UD0302 # 01 Y:1990 | 01 | 1990 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $2,135 | $0 | Implemented |
UD0302 # 02 Y:1990 | 02 | 1990 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $4,863 | $4,000 | Implemented |
UD0302 # 03 Y:1990 | 03 | 1990 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,311 | $0 | Not Implemented |
UD0302 # 04 Y:1990 | 04 | 1990 | INSTALL SET-BACK TIMERS | $795 | $0 | Not Implemented |
UD0302 # 05 Y:1990 | 05 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $357 | $700 | Not Implemented |
UD0302 # 06 Y:1990 | 06 | 1990 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,637 | $7,500 | Not Implemented |
UD0303 # 01 Y:1990 | 01 | 1990 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $2,148 | $0 | Implemented |
UD0303 # 02 Y:1990 | 02 | 1990 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $761 | $800 | Implemented |
UD0303 # 03 Y:1990 | 03 | 1990 | RECOVER WASTE HEAT FROM EQUIPMENT | $276 | $400 | Not Implemented |
UD0303 # 04 Y:1990 | 04 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,496 | $3,102 | Implemented |
UD0304 # 01 Y:1990 | 01 | 1990 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,855 | $2,800 | Not Implemented |
UD0304 # 02 Y:1990 | 02 | 1990 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $867 | $1,000 | Not Implemented |
UD0304 # 03 Y:1990 | 03 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,928 | $4,920 | Implemented |
UD0304 # 04 Y:1990 | 04 | 1990 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $332 | $0 | Implemented |