IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0286 # 03 Y:1989 03 1989 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $543 $0 Implemented
UD0286 # 04 Y:1989 04 1989 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $1,105 $6,000 Not Implemented
UD0286 # 05 Y:1989 05 1989 OPTIMIZE PLANT POWER FACTOR $6,809 $12,000 Implemented
UD0286 # 06 Y:1989 06 1989 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $117,912 $60,000 Implemented
UD0286 # 07 Y:1989 07 1989 INSTALL STORM WINDOWS AND DOORS $47,948 $47,000 Not Implemented
UD0286 # 08 Y:1989 08 1989 INSTALL TIMERS AND/OR THERMOSTATS $9,312 $0 Implemented
UD0283 # 01 Y:1989 01 1989 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,105 $2,000 Implemented
UD0283 # 02 Y:1989 02 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,833 $3,000 Implemented
UD0283 # 03 Y:1989 03 1989 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $738 $0 Implemented
UD0283 # 04 Y:1989 04 1989 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $602 $400 Implemented
UD0284 # 01 Y:1989 01 1989 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $38,356 $20,000 Implemented
UD0284 # 02 Y:1989 02 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,285 $0 Implemented
UD0284 # 03 Y:1989 03 1989 INSTALL STORM WINDOWS AND DOORS $14,561 $55,000 Not Implemented
UD0284 # 04 Y:1989 04 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,210 $0 Implemented
UD0284 # 05 Y:1989 05 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,648 $0 Implemented
UD0284 # 06 Y:1989 06 1989 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,404 $2,300 Implemented
UD0284 # 07 Y:1989 07 1989 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,361 $23,000 Not Implemented
UD0285 # 01 Y:1989 01 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,196 $700 Implemented
UD0285 # 02 Y:1989 02 1989 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,183 $2,400 Not Implemented
UD0285 # 03 Y:1989 03 1989 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $6,445 $400 Not Implemented
UD0285 # 04 Y:1989 04 1989 RECOVER WASTE HEAT FROM EQUIPMENT $941 $1,000 Not Implemented
UD0285 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $764 $1,005 Implemented
UD0285 # 06 Y:1989 06 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,534 $2,000 Implemented
UD0285 # 07 Y:1989 07 1989 INSTALL STORM WINDOWS AND DOORS $4,775 $2,300 Not Implemented
UD0285 # 08 Y:1989 08 1989 INSTALL TIMERS AND/OR THERMOSTATS $3,216 $600 Not Implemented