IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

94,135

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0095 # 02 Y:1983 02 1983 INSTALL TIMERS AND/OR THERMOSTATS $1,064 $1,400 Not Implemented
KU0095 # 03 Y:1983 03 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,017 $1,230 Not Implemented
KU0095 # 04 Y:1983 04 1983 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $878 $4,000 Not Implemented
KU0095 # 05 Y:1983 05 1983 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,846 $2,000 Not Implemented
KU0095 # 06 Y:1983 06 1983 INSTALL AUTOMATIC STACK DAMPER $1,323 $1,400 Not Implemented
KU0095 # 07 Y:1983 07 1983 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $925 $378 Not Implemented
KU0095 # 08 Y:1983 08 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $682 $120 Not Implemented
KU0095 # 09 Y:1983 09 1983 USE MINIMUM SAFE OVEN VENTILATION $629 $200 Not Implemented
KU0095 # 10 Y:1983 10 1983 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $127 $0 Not Implemented
TN0177 # 01 Y:1983 01 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $7,055 $1,170 Not Implemented
TN0177 # 02 Y:1983 02 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,540 $400 Implemented
TN0177 # 03 Y:1983 03 1983 USE MINIMUM STEAM OPERATING PRESSURE $2,625 $400 Implemented
TN0179 # 01 Y:1983 01 1983 OPTIMIZE PLANT POWER FACTOR $8,400 $5,000 Implemented
TN0179 # 02 Y:1983 02 1983 INSULATE BARE EQUIPMENT $2,291 $5,700 Implemented
TN0179 # 03 Y:1983 03 1983 USE SOLAR HEAT TO HEAT WATER $826 $24,000 Implemented
UD0095 # 01 Y:1983 01 1983 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $9,144 $18,000 Implemented
UD0095 # 02 Y:1983 02 1983 REPLACE PURCHASED STEAM WITH ELECTRIC HEATING $3,546 $2,000 Not Implemented
UD0095 # 03 Y:1983 03 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $583 $172 Implemented
UD0095 # 04 Y:1983 04 1983 INSTALL STORM WINDOWS AND DOORS $3,398 $2,560 Implemented
UD0096 # 01 Y:1983 01 1983 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $31,335 $45,000 Not Implemented
UD0096 # 02 Y:1983 02 1983 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,706 $0 Not Implemented
UD0096 # 03 Y:1983 03 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,923 $630 Not Implemented
UD0096 # 04 Y:1983 04 1983 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $476 $0 Not Implemented
UD0097 # 01 Y:1983 01 1983 INSTALL STORM WINDOWS AND DOORS $6,434 $6,887 Not Implemented
UD0097 # 02 Y:1983 02 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,662 $4,514 Not Implemented