IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,314

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0397 # 09 Y:2007 09 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,243 $3,825 Not Implemented
AS0433 # 01 Y:2006 01 2006 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $34,471 $30,000 n/a
AS0433 # 02 Y:2006 02 2006 USE SOLAR HEAT TO HEAT WATER $13,683 $78,400 n/a
AS0433 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,142 $7,500 n/a
AS0433 # 04 Y:2006 04 2006 INSTALL EFFICIENT RECTIFIERS $540 $15,000 n/a
AS0432 # 01 Y:2006 01 2006 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $17,236 $15,000 n/a
AS0432 # 02 Y:2006 02 2006 USE SOLAR HEAT TO HEAT WATER $13,683 $78,400 n/a
AS0432 # 03 Y:2006 03 2006 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $9,888 $3,000 n/a
AS0432 # 04 Y:2006 04 2006 INSTALL EFFICIENT RECTIFIERS $540 $15,000 n/a
AS0431 # 01 Y:2006 01 2006 USE SOLAR HEAT TO HEAT WATER $1,728 $8,800 n/a
AS0431 # 02 Y:2006 02 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,413 $1,500 n/a
AS0431 # 03 Y:2006 03 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $529 $1,500 n/a
AS0431 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $401 $1,500 n/a
AS0431 # 05 Y:2006 05 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $370 $1,000 n/a
AS0430 # 01 Y:2006 01 2006 USE SOLAR HEAT TO MAKE ELECTRICTY $136,800 $2 Not Implemented
AS0430 # 02 Y:2006 02 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,545 $7,500 Implemented
AS0430 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $3 $1,077 Implemented
AS0430 # 04 Y:2006 04 2006 INSTALL SKYLIGHTS $782 $4,400 Implemented
AS0430 # 05 Y:2006 05 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $770 $1,000 Not Implemented
AS0428 # 01 Y:2006 01 2006 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $15,000 $0 n/a
AS0428 # 02 Y:2006 02 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,791 $1,000 n/a
AS0428 # 03 Y:2006 03 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,918 $2,500 n/a
AS0428 # 04 Y:2006 04 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,269 $5,600 n/a
AS0428 # 05 Y:2006 05 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,252 $1,500 n/a
AS0428 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,348 $5,000 n/a