Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0046 # 04 Y:1982 | 04 | 1982 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,794 | $900 | Not Implemented |
UD0041 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,083 | $590 | Implemented |
UD0041 # 02 Y:1982 | 02 | 1982 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,154 | $500 | Not Implemented |
UD0041 # 04 Y:1982 | 04 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $420 | $0 | Implemented |
UD0041 # 05 Y:1982 | 05 | 1982 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,683 | $5,588 | Not Implemented |
UD0042 # 01 Y:1982 | 01 | 1982 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,309 | $1,610 | Implemented |
UD0042 # 02 Y:1982 | 02 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,870 | $1,450 | Implemented |
UD0042 # 03 Y:1982 | 03 | 1982 | INSTALL TIMERS AND/OR THERMOSTATS | $6,580 | $139 | Implemented |
UD0042 # 04 Y:1982 | 04 | 1982 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,997 | $0 | Implemented |
UD0042 # 05 Y:1982 | 05 | 1982 | REDUCE GLAZED AREAS IN BUILDINGS | $1,633 | $3,410 | Implemented |
UD0042 # 06 Y:1982 | 06 | 1982 | USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC | $866 | $4,000 | Implemented |
UD0043 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $935 | $380 | Not Implemented |
UD0043 # 02 Y:1982 | 02 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $729 | $700 | Implemented |
UD0043 # 03 Y:1982 | 03 | 1982 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $11,488 | $5,000 | Not Implemented |
UD0037 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $935 | $379 | Not Implemented |
UD0037 # 02 Y:1982 | 02 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $350 | $0 | Not Implemented |
UD0037 # 03 Y:1982 | 03 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,116 | $300 | Not Implemented |
UD0037 # 04 Y:1982 | 04 | 1982 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,573 | $3,500 | Implemented |
UD0037 # 05 Y:1982 | 05 | 1982 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,974 | $6,500 | Not Implemented |
UD0038 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,301 | $50 | Implemented |
UD0038 # 02 Y:1982 | 02 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $721 | $0 | Implemented |
UD0038 # 03 Y:1982 | 03 | 1982 | SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS | $3,584 | $1,500 | Implemented |
UD0038 # 04 Y:1982 | 04 | 1982 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,327 | $300 | Implemented |
UD0038 # 05 Y:1982 | 05 | 1982 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,854 | $10,000 | Implemented |
UD0039 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,698 | $1,557 | Implemented |