Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,314
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0425 # 03 Y:2006 | 03 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,670 | $1,000 | Not Implemented |
AS0425 # 04 Y:2006 | 04 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $382 | $99 | Implemented |
AS0424 # 01 Y:2006 | 01 | 2006 | REPAIR AND ELIMINATE STEAM LEAKS | $6,478 | $800 | n/a |
AS0424 # 02 Y:2006 | 02 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,125 | $44,393 | n/a |
AS0424 # 03 Y:2006 | 03 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,418 | $1,000 | n/a |
AS0424 # 04 Y:2006 | 04 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,909 | $2,240 | n/a |
AS0423 # 01 Y:2006 | 01 | 2006 | CONDENSE OPERATION INTO ONE BUILDING | $205,767 | $2,100,000 | n/a |
AS0423 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,786 | $1,000 | n/a |
AS0423 # 03 Y:2006 | 03 | 2006 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $13,786 | $13,000 | n/a |
AS0423 # 04 Y:2006 | 04 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $13,316 | $10,000 | n/a |
AS0423 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,912 | $10,000 | n/a |
AS0423 # 06 Y:2006 | 06 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $8,401 | $16,000 | n/a |
AS0422 # 01 Y:2006 | 01 | 2006 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $562,419 | $119,490 | n/a |
AS0422 # 02 Y:2006 | 02 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $8,736 | $9,000 | n/a |
AS0422 # 03 Y:2006 | 03 | 2006 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,763 | $33,120 | n/a |
AS0422 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $231 | $13,918 | n/a |
AS0422 # 05 Y:2006 | 05 | 2006 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,824 | $0 | n/a |
AS0420 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,359 | $18,572 | Implemented |
AS0420 # 02 Y:2006 | 02 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $2,260 | $10,000 | Not Implemented |
AS0420 # 03 Y:2006 | 03 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,254 | $3,300 | Not Implemented |
AS0420 # 04 Y:2006 | 04 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,765 | $1,000 | Not Implemented |
AS0420 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,338 | $5,000 | Implemented |
AS0420 # 06 Y:2006 | 06 | 2006 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $885 | $13,820 | Implemented |
AS0421 # 01 Y:2006 | 01 | 2006 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $79,716 | $39,658 | n/a |
AS0421 # 02 Y:2006 | 02 | 2006 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $3,068 | $1,500 | n/a |