IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,150

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0070 # 03 Y:1983 03 1983 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $8,631 $5,200 Not Implemented
KU0070 # 04 Y:1983 04 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,046 $3,942 Not Implemented
KU0070 # 05 Y:1983 05 1983 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,975 $13,000 Implemented
KU0070 # 06 Y:1983 06 1983 OPTIMIZE PLANT POWER FACTOR $3,510 $5,820 Not Implemented
KU0070 # 07 Y:1983 07 1983 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $664 $42 Implemented
KU0070 # 08 Y:1983 08 1983 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $615 $0 Not Implemented
KU0070 # 09 Y:1983 09 1983 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $502 $72 Not Implemented
KU0071 # 01 Y:1983 01 1983 AIR CONDITION ONLY SPACE NECESSARY $10,942 $5,000 Not Implemented
KU0071 # 02 Y:1983 02 1983 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,528 $15,000 Not Implemented
KU0071 # 03 Y:1983 03 1983 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,367 $580 Implemented
KU0071 # 04 Y:1983 04 1983 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,383 $862 Not Implemented
KU0071 # 05 Y:1983 05 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,450 $30 Implemented
KU0071 # 06 Y:1983 06 1983 INSTALL AUTOMATIC STACK DAMPER $1,202 $720 Not Implemented
KU0071 # 07 Y:1983 07 1983 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $798 $250 Implemented
KU0071 # 08 Y:1983 08 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $593 $200 Not Implemented
KU0071 # 09 Y:1983 09 1983 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $330 $0 Not Implemented
KU0071 # 10 Y:1983 10 1983 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $124 $87 Implemented
KU0073 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,857 $11,353 Not Implemented
GT0155 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,044 $2,500 Not Implemented
GT0155 # 02 Y:1983 02 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,170 $192 Not Implemented
GT0155 # 03 Y:1983 03 1983 MODIFY DYE BECK $5,192 $0 Not Implemented
GT0155 # 04 Y:1983 04 1983 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $5,373 $7,500 Not Implemented
GT0155 # 05 Y:1983 05 1983 INSULATE BARE EQUIPMENT $829 $574 Not Implemented
GT0155 # 06 Y:1983 06 1983 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $588 $466 Not Implemented
GT0155 # 07 Y:1983 07 1983 REPAIR AND ELIMINATE STEAM LEAKS $176 $40 Not Implemented