IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,629

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0268 # 04 Y:1988 04 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $281 $0 Implemented
UD0269 # 01 Y:1988 01 1988 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $227 $0 Implemented
UD0269 # 02 Y:1988 02 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $830 $633 Implemented
UD0269 # 03 Y:1988 03 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $242 $500 Implemented
UD0269 # 04 Y:1988 04 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,782 $5,000 Implemented
UD0270 # 01 Y:1988 01 1988 REDESIGN PROCESS $3,796 $1,000 Implemented
UD0270 # 02 Y:1988 02 1988 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $1,575 $1,000 Implemented
GT0339 # 01 Y:1988 01 1988 ISOLATE HOT OR COLD EQUIPMENT $479 $1,000 Not Implemented
GT0339 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,008 $0 Implemented
GT0339 # 03 Y:1988 03 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,170 $6,600 Implemented
GT0339 # 04 Y:1988 04 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $50 $0 Implemented
GT0339 # 05 Y:1988 05 1988 USE DEMAND CONTROLLER OR LOAD SHEDDER $10,750 $10,300 Not Implemented
GT0340 # 01 Y:1988 01 1988 RECOVER WASTE HEAT FROM EQUIPMENT $1,410 $1,640 Implemented
GT0340 # 02 Y:1988 02 1988 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,580 $1,000 Implemented
GT0340 # 03 Y:1988 03 1988 INSULATE BARE EQUIPMENT $320 $160 Implemented
GT0340 # 04 Y:1988 04 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,790 $12,930 Not Implemented
GT0340 # 05 Y:1988 05 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,300 $1,800 Implemented
GT0340 # 06 Y:1988 06 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $213 $237 Implemented
GT0341 # 01 Y:1988 01 1988 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $360 $550 Implemented
GT0341 # 02 Y:1988 02 1988 REDUCE VENTILATION AIR $2,230 $400 Implemented
GT0341 # 03 Y:1988 03 1988 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,170 $760 Not Implemented
GT0341 # 04 Y:1988 04 1988 KEEP LAMPS AND REFLECTORS CLEAN $1,730 $3,720 Not Implemented
GT0341 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $480 $460 Not Implemented
GT0341 # 06 Y:1988 06 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $111 $112 Not Implemented
GT0341 # 07 Y:1988 07 1988 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,850 $400 Implemented