IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0252 # 06 Y:1995 06 1995 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $690 $1,000 Not Implemented
WI0252 # 07 Y:1995 07 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $371 $800 Not Implemented
WI0252 # 08 Y:1995 08 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $125 $30 Implemented
WI0252 # 09 Y:1995 09 1995 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $911 $4,200 Not Implemented
WI0252 # 10 Y:1995 10 1995 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $543 $525 Not Implemented
UL0138 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,046 $6,889 Not Implemented
UL0138 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $408 $725 Not Implemented
UL0138 # 03 Y:1995 03 1995 OPTIMIZE PLANT POWER FACTOR $28,107 $27,720 Not Implemented
UL0138 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,945 $50 Not Implemented
UL0138 # 05 Y:1995 05 1995 OPTIMIZE PLANT POWER FACTOR $4,224 $3,600 Not Implemented
UL0138 # 06 Y:1995 06 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,170 $60 Not Implemented
UL0138 # 07 Y:1995 07 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,987 $2,000 Not Implemented
UF0132 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,637 $32,604 Implemented
UF0132 # 02 Y:1995 02 1995 INSTALL OCCUPANCY SENSORS $4,087 $192 Not Implemented
UF0132 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,055 $1,094 Implemented
UF0132 # 04 Y:1995 04 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,399 $40,610 Not Implemented
UF0132 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,768 $350 Implemented
UF0132 # 06 Y:1995 06 1995 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $7,950 $15,000 Not Implemented
UF0132 # 07 Y:1995 07 1995 USE POWER DURING OFF-PEAK PERIODS $3,802 $0 Not Implemented
HO0115 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $776 $1,011 Not Implemented
HO0115 # 02 Y:1995 02 1995 KEEP BOILER TUBES CLEAN $2,569 $2,800 Not Implemented
HO0115 # 03 Y:1995 03 1995 INSTALL OCCUPANCY SENSORS $2,276 $400 Not Implemented
HO0115 # 04 Y:1995 04 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $583 $250 Not Implemented
HO0115 # 05 Y:1995 05 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,913 $8,000 Not Implemented
HO0115 # 06 Y:1995 06 1995 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $6,957 $4,000 Not Implemented