Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,055
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0252 # 06 Y:1995 | 06 | 1995 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $690 | $1,000 | Not Implemented |
WI0252 # 07 Y:1995 | 07 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $371 | $800 | Not Implemented |
WI0252 # 08 Y:1995 | 08 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $125 | $30 | Implemented |
WI0252 # 09 Y:1995 | 09 | 1995 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $911 | $4,200 | Not Implemented |
WI0252 # 10 Y:1995 | 10 | 1995 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $543 | $525 | Not Implemented |
UL0138 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,046 | $6,889 | Not Implemented |
UL0138 # 02 Y:1995 | 02 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $408 | $725 | Not Implemented |
UL0138 # 03 Y:1995 | 03 | 1995 | OPTIMIZE PLANT POWER FACTOR | $28,107 | $27,720 | Not Implemented |
UL0138 # 04 Y:1995 | 04 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,945 | $50 | Not Implemented |
UL0138 # 05 Y:1995 | 05 | 1995 | OPTIMIZE PLANT POWER FACTOR | $4,224 | $3,600 | Not Implemented |
UL0138 # 06 Y:1995 | 06 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,170 | $60 | Not Implemented |
UL0138 # 07 Y:1995 | 07 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,987 | $2,000 | Not Implemented |
UF0132 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,637 | $32,604 | Implemented |
UF0132 # 02 Y:1995 | 02 | 1995 | INSTALL OCCUPANCY SENSORS | $4,087 | $192 | Not Implemented |
UF0132 # 03 Y:1995 | 03 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,055 | $1,094 | Implemented |
UF0132 # 04 Y:1995 | 04 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,399 | $40,610 | Not Implemented |
UF0132 # 05 Y:1995 | 05 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,768 | $350 | Implemented |
UF0132 # 06 Y:1995 | 06 | 1995 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $7,950 | $15,000 | Not Implemented |
UF0132 # 07 Y:1995 | 07 | 1995 | USE POWER DURING OFF-PEAK PERIODS | $3,802 | $0 | Not Implemented |
HO0115 # 01 Y:1995 | 01 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $776 | $1,011 | Not Implemented |
HO0115 # 02 Y:1995 | 02 | 1995 | KEEP BOILER TUBES CLEAN | $2,569 | $2,800 | Not Implemented |
HO0115 # 03 Y:1995 | 03 | 1995 | INSTALL OCCUPANCY SENSORS | $2,276 | $400 | Not Implemented |
HO0115 # 04 Y:1995 | 04 | 1995 | INSTALL / REPAIR INSULATION ON STEAM LINES | $583 | $250 | Not Implemented |
HO0115 # 05 Y:1995 | 05 | 1995 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $12,913 | $8,000 | Not Implemented |
HO0115 # 06 Y:1995 | 06 | 1995 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $6,957 | $4,000 | Not Implemented |