Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,746
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0207 # 02 Y:1984 | 02 | 1984 | INSULATE BARE EQUIPMENT | $18,357 | $750 | Implemented |
TN0207 # 03 Y:1984 | 03 | 1984 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,215 | $21,000 | Implemented |
TN0207 # 04 Y:1984 | 04 | 1984 | INSTALL SET-BACK TIMERS | $645 | $0 | Implemented |
TN0207 # 05 Y:1984 | 05 | 1984 | INSULATE BARE EQUIPMENT | $250 | $78 | Not Implemented |
TN0208 # 01 Y:1984 | 01 | 1984 | AIR CONDITION ONLY SPACE NECESSARY | $2,708 | $132 | Not Implemented |
TN0208 # 02 Y:1984 | 02 | 1984 | INSTALL STORM WINDOWS AND DOORS | $731 | $123 | Not Implemented |
TN0208 # 03 Y:1984 | 03 | 1984 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $120 | $10 | Not Implemented |
TN0209 # 01 Y:1984 | 01 | 1984 | IMPROVE LUBRICATION PRACTICES | $117 | $0 | Implemented |
TN0209 # 02 Y:1984 | 02 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $106 | $50 | Implemented |
TN0209 # 03 Y:1984 | 03 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $59 | $215 | Implemented |
TN0210 # 01 Y:1984 | 01 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,637 | $100 | Implemented |
TN0210 # 02 Y:1984 | 02 | 1984 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,764 | $2,000 | Implemented |
TN0210 # 03 Y:1984 | 03 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $879 | $2,780 | Not Implemented |
TN0210 # 04 Y:1984 | 04 | 1984 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $189 | $70 | Implemented |
TN0210 # 05 Y:1984 | 05 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $246 | $20 | Implemented |
TN0211 # 01 Y:1984 | 01 | 1984 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $890 | $0 | Not Implemented |
TN0211 # 02 Y:1984 | 02 | 1984 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,051 | $0 | Implemented |
TN0211 # 03 Y:1984 | 03 | 1984 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,366 | $2,753 | Implemented |
TN0213 # 01 Y:1984 | 01 | 1984 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $375 | $1,240 | Not Implemented |
TN0213 # 02 Y:1984 | 02 | 1984 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $228 | $0 | Not Implemented |
TN0213 # 03 Y:1984 | 03 | 1984 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $35 | $0 | Not Implemented |
GT0214 # 01 Y:1984 | 01 | 1984 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,957 | $15,000 | Implemented |
GT0214 # 02 Y:1984 | 02 | 1984 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $1,493 | $2,000 | Implemented |
GT0214 # 03 Y:1984 | 03 | 1984 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $7,406 | $10,000 | Implemented |
GT0214 # 04 Y:1984 | 04 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,664 | $2,000 | Implemented |