IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,746

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0207 # 02 Y:1984 02 1984 INSULATE BARE EQUIPMENT $18,357 $750 Implemented
TN0207 # 03 Y:1984 03 1984 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,215 $21,000 Implemented
TN0207 # 04 Y:1984 04 1984 INSTALL SET-BACK TIMERS $645 $0 Implemented
TN0207 # 05 Y:1984 05 1984 INSULATE BARE EQUIPMENT $250 $78 Not Implemented
TN0208 # 01 Y:1984 01 1984 AIR CONDITION ONLY SPACE NECESSARY $2,708 $132 Not Implemented
TN0208 # 02 Y:1984 02 1984 INSTALL STORM WINDOWS AND DOORS $731 $123 Not Implemented
TN0208 # 03 Y:1984 03 1984 SHUT OFF PILOTS IN STANDBY EQUIPMENT $120 $10 Not Implemented
TN0209 # 01 Y:1984 01 1984 IMPROVE LUBRICATION PRACTICES $117 $0 Implemented
TN0209 # 02 Y:1984 02 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $106 $50 Implemented
TN0209 # 03 Y:1984 03 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $59 $215 Implemented
TN0210 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,637 $100 Implemented
TN0210 # 02 Y:1984 02 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $2,764 $2,000 Implemented
TN0210 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $879 $2,780 Not Implemented
TN0210 # 04 Y:1984 04 1984 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $189 $70 Implemented
TN0210 # 05 Y:1984 05 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $246 $20 Implemented
TN0211 # 01 Y:1984 01 1984 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $890 $0 Not Implemented
TN0211 # 02 Y:1984 02 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,051 $0 Implemented
TN0211 # 03 Y:1984 03 1984 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,366 $2,753 Implemented
TN0213 # 01 Y:1984 01 1984 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $375 $1,240 Not Implemented
TN0213 # 02 Y:1984 02 1984 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $228 $0 Not Implemented
TN0213 # 03 Y:1984 03 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $35 $0 Not Implemented
GT0214 # 01 Y:1984 01 1984 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,957 $15,000 Implemented
GT0214 # 02 Y:1984 02 1984 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $1,493 $2,000 Implemented
GT0214 # 03 Y:1984 03 1984 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $7,406 $10,000 Implemented
GT0214 # 04 Y:1984 04 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,664 $2,000 Implemented