IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,417

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0317 # 02 Y:1990 02 1990 INSTALL TIMERS AND/OR THERMOSTATS $1,265 $1,050 Implemented
OK0317 # 03 Y:1990 03 1990 INSTALL TURBULATORS $429 $675 Implemented
OK0318 # 01 Y:1990 01 1990 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,141 $49,497 Implemented
OK0318 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,252 $8,724 Implemented
OK0318 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,228 $245 Implemented
OK0318 # 04 Y:1990 04 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,868 $981 Implemented
OK0318 # 05 Y:1990 05 1990 INSULATE BARE EQUIPMENT $2,067 $1,265 Implemented
OK0318 # 06 Y:1990 06 1990 INSTALL TIMERS AND/OR THERMOSTATS $286 $450 Implemented
OK0318 # 07 Y:1990 07 1990 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $232,376 $678,000 Not Implemented
OR0087 # 01 Y:1990 01 1990 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,019 $548 Not Implemented
OR0087 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $934 $1,451 Implemented
OR0087 # 03 Y:1990 03 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $95 $0 Implemented
OR0087 # 04 Y:1990 04 1990 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $38,901 $50,000 Implemented
OR0087 # 05 Y:1990 05 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $250 $744 Implemented
OR0088 # 01 Y:1990 01 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,047 $500 Implemented
OR0088 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,353 $2,000 Implemented
OR0088 # 03 Y:1990 03 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $2,857 $3,790 Not Implemented
OR0088 # 04 Y:1990 04 1990 RECOVER WASTE HEAT FROM EQUIPMENT $1,340 $1,678 Not Implemented
OR0088 # 05 Y:1990 05 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $593 $952 Implemented
OR0088 # 06 Y:1990 06 1990 INSULATE FEEDWATER TANK $745 $1,198 Implemented
OR0088 # 07 Y:1990 07 1990 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $344 $600 Not Implemented
OR0088 # 08 Y:1990 08 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $198 $392 Implemented
OR0088 # 09 Y:1990 09 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,302 $2,837 Not Implemented
OR0096 # 01 Y:1990 01 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,821 $5,000 Implemented
OR0096 # 02 Y:1990 02 1990 OPTIMIZE PLANT POWER FACTOR $4,273 $2,500 Implemented