Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,417
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0317 # 02 Y:1990 | 02 | 1990 | INSTALL TIMERS AND/OR THERMOSTATS | $1,265 | $1,050 | Implemented |
OK0317 # 03 Y:1990 | 03 | 1990 | INSTALL TURBULATORS | $429 | $675 | Implemented |
OK0318 # 01 Y:1990 | 01 | 1990 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $35,141 | $49,497 | Implemented |
OK0318 # 02 Y:1990 | 02 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,252 | $8,724 | Implemented |
OK0318 # 03 Y:1990 | 03 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,228 | $245 | Implemented |
OK0318 # 04 Y:1990 | 04 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,868 | $981 | Implemented |
OK0318 # 05 Y:1990 | 05 | 1990 | INSULATE BARE EQUIPMENT | $2,067 | $1,265 | Implemented |
OK0318 # 06 Y:1990 | 06 | 1990 | INSTALL TIMERS AND/OR THERMOSTATS | $286 | $450 | Implemented |
OK0318 # 07 Y:1990 | 07 | 1990 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $232,376 | $678,000 | Not Implemented |
OR0087 # 01 Y:1990 | 01 | 1990 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,019 | $548 | Not Implemented |
OR0087 # 02 Y:1990 | 02 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $934 | $1,451 | Implemented |
OR0087 # 03 Y:1990 | 03 | 1990 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $95 | $0 | Implemented |
OR0087 # 04 Y:1990 | 04 | 1990 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $38,901 | $50,000 | Implemented |
OR0087 # 05 Y:1990 | 05 | 1990 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $250 | $744 | Implemented |
OR0088 # 01 Y:1990 | 01 | 1990 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,047 | $500 | Implemented |
OR0088 # 02 Y:1990 | 02 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,353 | $2,000 | Implemented |
OR0088 # 03 Y:1990 | 03 | 1990 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,857 | $3,790 | Not Implemented |
OR0088 # 04 Y:1990 | 04 | 1990 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,340 | $1,678 | Not Implemented |
OR0088 # 05 Y:1990 | 05 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $593 | $952 | Implemented |
OR0088 # 06 Y:1990 | 06 | 1990 | INSULATE FEEDWATER TANK | $745 | $1,198 | Implemented |
OR0088 # 07 Y:1990 | 07 | 1990 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $344 | $600 | Not Implemented |
OR0088 # 08 Y:1990 | 08 | 1990 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $198 | $392 | Implemented |
OR0088 # 09 Y:1990 | 09 | 1990 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,302 | $2,837 | Not Implemented |
OR0096 # 01 Y:1990 | 01 | 1990 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,821 | $5,000 | Implemented |
OR0096 # 02 Y:1990 | 02 | 1990 | OPTIMIZE PLANT POWER FACTOR | $4,273 | $2,500 | Implemented |