IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

144,065

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OD0011 # 06 Y:1994 06 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,613 $860 Implemented
OD0011 # 07 Y:1994 07 1994 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,051 $0 Implemented
NV0009 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,106 $1,200 Implemented
NV0009 # 02 Y:1994 02 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,838 $100 Implemented
NV0009 # 03 Y:1994 03 1994 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $13,655 $5,000 Not Implemented
NV0009 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $20,542 $25,047 Implemented
NV0009 # 05 Y:1994 05 1994 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,646 $2,200 Implemented
NV0009 # 06 Y:1994 06 1994 INSTALL OCCUPANCY SENSORS $2,237 $80 Implemented
NV0009 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,600 $0 Implemented
GT0535 # 01 Y:1994 01 1994 CHECK FOR ACCURACY OF UTILITY / POWER METERS $12,502 $0 Implemented
GT0535 # 02 Y:1994 02 1994 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,230 $0 Not Implemented
GT0535 # 03 Y:1994 03 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,505 $22,420 Not Implemented
GT0535 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $100 $940 Implemented
UD0440 # 01 Y:1994 01 1994 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,448 $0 n/a
UD0440 # 02 Y:1994 02 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,640 $250 n/a
UD0440 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,786 $3,000 n/a
UD0440 # 04 Y:1994 04 1994 ADD AREA LIGHTING SWITCHES $2,496 $200 n/a
UD0440 # 05 Y:1994 05 1994 ADD AREA LIGHTING SWITCHES $1,454 $200 n/a
ME0140 # 01 Y:1994 01 1994 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,095 $5,760 Not Implemented
ME0140 # 02 Y:1994 02 1994 COVER OPEN TANKS $2,550 $1,310 Not Implemented
ME0140 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,670 $250 Not Implemented
ME0140 # 04 Y:1994 04 1994 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $952 $65 Not Implemented
ME0140 # 05 Y:1994 05 1994 INSTALL OCCUPANCY SENSORS $356 $300 Not Implemented
ME0140 # 06 Y:1994 06 1994 INSTALL OCCUPANCY SENSORS $1,672 $550 Not Implemented
ME0140 # 07 Y:1994 07 1994 INSULATE BARE EQUIPMENT $679 $269 Not Implemented