IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,130

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0499 # 09 Y:1993 09 1993 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,165 $1,000 Implemented
GT0499 # 10 Y:1993 10 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,280 $23,650 Implemented
GT0499 # 11 Y:1993 11 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,185 $14,200 Implemented
GT0499 # 12 Y:1993 12 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $630 $0 Implemented
GT0499 # 13 Y:1993 13 1993 INSTALL SET-BACK TIMERS $9,555 $31,200 Not Implemented
GT0499 # 14 Y:1993 14 1993 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $19,420 $1,000 Implemented
CO0280 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,120 $12,600 Implemented
CO0280 # 02 Y:1993 02 1993 INSULATE BARE EQUIPMENT $3,150 $1,730 Implemented
CO0280 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,760 $1,710 Not Implemented
CO0280 # 04 Y:1993 04 1993 INSULATE BARE EQUIPMENT $950 $1,280 Not Implemented
CO0280 # 05 Y:1993 05 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $870 $250 Not Implemented
CO0280 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $360 $100 Implemented
GT0503 # 01 Y:1993 01 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $39,070 $144,720 Not Implemented
GT0503 # 02 Y:1993 02 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,830 $51,700 Not Implemented
GT0503 # 03 Y:1993 03 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,260 $0 Not Implemented
GT0503 # 04 Y:1993 04 1993 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,700 $3,090 Implemented
GT0503 # 05 Y:1993 05 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $780 $450 Implemented
GT0503 # 06 Y:1993 06 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,340 $0 Not Implemented
GT0503 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,350 $76,040 Not Implemented
WI0187 # 01 Y:1993 01 1993 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,534 $750 Implemented
WI0187 # 02 Y:1993 02 1993 INSULATE BARE EQUIPMENT $343 $184 Implemented
WI0187 # 03 Y:1993 03 1993 INSULATE BARE EQUIPMENT $278 $40 Implemented
WI0187 # 04 Y:1993 04 1993 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,097 $200 Not Implemented
WI0187 # 05 Y:1993 05 1993 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $2,023 $5,000 Not Implemented
WI0187 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $841 $2,800 Not Implemented