IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143,278

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0492 # 02 Y:1993 02 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,218 $840 Implemented
TN0492 # 03 Y:1993 03 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $2,066 $0 Implemented
TN0492 # 04 Y:1993 04 1993 INSTALL TIMERS AND/OR THERMOSTATS $1,474 $720 Implemented
TN0492 # 05 Y:1993 05 1993 USE SYNTHETIC LUBRICANT $399 $0 Not Implemented
TN0492 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $248 $225 Not Implemented
TN0492 # 07 Y:1993 07 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $193 $0 Implemented
ND0150 # 01 Y:1993 01 1993 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $613 $188 Implemented
ND0150 # 02 Y:1993 02 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,776 $1,350 Implemented
ND0150 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,499 $1,132 Implemented
ND0150 # 04 Y:1993 04 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $291 $698 Implemented
ND0150 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,600 $3,713 Implemented
ND0150 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $154 $180 Implemented
ME0104 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $950 $200 Implemented
ME0104 # 02 Y:1993 02 1993 INSULATE BARE EQUIPMENT $1,217 $500 Implemented
ME0104 # 03 Y:1993 03 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,808 $0 Implemented
ME0104 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,446 $200 Implemented
ME0104 # 05 Y:1993 05 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,735 $50 Implemented
OK0401 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,436 $648 Implemented
OK0401 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,229 $12,281 Implemented
OK0401 # 03 Y:1993 03 1993 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,081 $69 Implemented
OK0401 # 04 Y:1993 04 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,239 $11,720 Not Implemented
OK0401 # 05 Y:1993 05 1993 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $352 $168 Implemented
OK0401 # 06 Y:1993 06 1993 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $21,033 $8,169 Not Implemented
OK0401 # 07 Y:1993 07 1993 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $8,585 $31,250 Not Implemented
MO0083 # 01 Y:1993 01 1993 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $5,261 $13,500 Not Implemented