IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142,601

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0014 # 02 Y:1992 02 1992 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $914 $1,800 Implemented
SD0014 # 03 Y:1992 03 1992 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $71 $1,200 Not Implemented
SD0014 # 04 Y:1992 04 1992 INSTALL SET-BACK TIMERS $7,040 $8,473 Not Implemented
SD0014 # 05 Y:1992 05 1992 KEEP LAMPS AND REFLECTORS CLEAN $16,709 $26,424 Implemented
SD0015 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $312 $567 Not Implemented
SD0015 # 02 Y:1992 02 1992 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $1,236 $3,800 Not Implemented
SD0015 # 03 Y:1992 03 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,822 $2,000 Not Implemented
SD0015 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $647 $544 Not Implemented
SD0015 # 05 Y:1992 05 1992 INSTALL SET-BACK TIMERS $1,106 $1,650 Not Implemented
SD0015 # 06 Y:1992 06 1992 KEEP LAMPS AND REFLECTORS CLEAN $9,743 $1,657 Not Implemented
MA0235 # 01 Y:1992 01 1992 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $94,715 $181,225 Not Implemented
MA0235 # 02 Y:1992 02 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,460 $14,275 Not Implemented
MA0235 # 03 Y:1992 03 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,525 $24,600 Implemented
MA0235 # 04 Y:1992 04 1992 REPAIR AND ELIMINATE STEAM LEAKS $7,975 $165 Implemented
MA0235 # 05 Y:1992 05 1992 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,141 $584 Not Implemented
AS0048 # 01 Y:1992 01 1992 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $8,626 $3,200 Implemented
AS0048 # 02 Y:1992 02 1992 KEEP LAMPS AND REFLECTORS CLEAN $8,054 $8,825 Not Implemented
AS0048 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,876 $4,421 Implemented
AS0048 # 04 Y:1992 04 1992 KEEP LAMPS AND REFLECTORS CLEAN $1,217 $3,420 Not Implemented
AS0048 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $345 $3,363 Implemented
AS0048 # 06 Y:1992 06 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $270 $774 Implemented
AS0048 # 07 Y:1992 07 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $377 $0 Implemented
AS0048 # 08 Y:1992 08 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $998 $0 Implemented
AS0048 # 09 Y:1992 09 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $663 $100 Implemented
AS0048 # 10 Y:1992 10 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $564 $500 Implemented