IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,582

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0024 # 08 Y:2002 08 2002 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $58,590 $720 Implemented
UU0023 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,845 $110 Implemented
UU0023 # 02 Y:2002 02 2002 USE SYNTHETIC LUBRICANT $833 $300 Not Implemented
UU0023 # 03 Y:2002 03 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $16,303 $14,000 Implemented
UU0023 # 04 Y:2002 04 2002 MINIMIZE WATER USAGE $4,827 $18,490 Not Implemented
UU0023 # 05 Y:2002 05 2002 MINIMIZE WATER USAGE $695 $0 Implemented
UU0022 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,290 $53,909 Not Implemented
UU0022 # 02 Y:2002 02 2002 OPTIMIZE PLANT POWER FACTOR $5,007 $7,160 Implemented
UU0022 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,373 $365 Implemented
UU0022 # 04 Y:2002 04 2002 INSTALL SKYLIGHTS $21,234 $34,000 Not Implemented
UU0022 # 05 Y:2002 05 2002 UPGRADE OBSOLETE EQUIPMENT $18,175 $80,000 Not Implemented
UU0022 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,022 $326 Implemented
UU0022 # 07 Y:2002 07 2002 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $32,358 $17,100 Implemented
UU0021 # 01 Y:2002 01 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,413 $8,128 Not Implemented
UU0021 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $3,462 $610 Implemented
UU0021 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,467 $460 Implemented
UU0021 # 04 Y:2002 04 2002 OPTIMIZE PLANT POWER FACTOR $14,706 $18,000 Implemented
UU0021 # 05 Y:2002 05 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $22,256 $31,800 Not Implemented
UU0021 # 06 Y:2002 06 2002 RECOVER AND REUSE WASTE MATERIAL $62,291 $17,100 Implemented
UU0020 # 01 Y:2002 01 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,006 $21,657 Implemented
UU0020 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,242 $2,173 Not Implemented
UU0020 # 03 Y:2002 03 2002 USE SYNTHETIC LUBRICANT $1,257 $800 Implemented
UU0020 # 04 Y:2002 04 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,089 $489 Implemented
UU0020 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,441 $2,664 Implemented
UU0020 # 06 Y:2002 06 2002 COVER OPEN TANKS $739 $100 Not Implemented