IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

146,354

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0128 # 03 Y:1982 03 1982 RECOVER WASTE HEAT FROM EQUIPMENT $2,660 $4,250 Not Implemented
TN0130 # 01 Y:1982 01 1982 TURN OFF EQUIPMENT WHEN NOT IN USE $15,419 $3,500 Not Implemented
TN0130 # 02 Y:1982 02 1982 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $7,571 $5,400 Not Implemented
TN0130 # 03 Y:1982 03 1982 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,269 $1,000 Not Implemented
TN0130 # 04 Y:1982 04 1982 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,775 $3,320 Not Implemented
TN0131 # 01 Y:1982 01 1982 INSTALL / REPAIR INSULATION ON STEAM LINES $10,264 $3,000 Not Implemented
TN0131 # 02 Y:1982 02 1982 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,109 $2,700 Not Implemented
TN0131 # 03 Y:1982 03 1982 RECOVER WASTE HEAT FROM EQUIPMENT $632 $2,800 Not Implemented
TN0132 # 01 Y:1982 01 1982 COVER OPEN TANKS $790 $200 Not Implemented
TN0132 # 02 Y:1982 02 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $340 $0 Not Implemented
TN0132 # 03 Y:1982 03 1982 OPTIMIZE PLANT POWER FACTOR $3,200 $5,000 Not Implemented
UD0037 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $935 $379 Not Implemented
UD0037 # 02 Y:1982 02 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $350 $0 Not Implemented
UD0037 # 03 Y:1982 03 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,116 $300 Not Implemented
UD0037 # 04 Y:1982 04 1982 RECOVER WASTE HEAT FROM EQUIPMENT $3,573 $3,500 Implemented
UD0037 # 05 Y:1982 05 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,974 $6,500 Not Implemented
UD0038 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,301 $50 Implemented
UD0038 # 02 Y:1982 02 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $721 $0 Implemented
UD0038 # 03 Y:1982 03 1982 SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS $3,584 $1,500 Implemented
UD0038 # 04 Y:1982 04 1982 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,327 $300 Implemented
UD0038 # 05 Y:1982 05 1982 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,854 $10,000 Implemented
UD0039 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,698 $1,557 Implemented
UD0039 # 02 Y:1982 02 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $480 $0 Implemented
UD0039 # 03 Y:1982 03 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $357 $300 Implemented
UD0039 # 04 Y:1982 04 1982 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $7,302 $13,500 Implemented