IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,224

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CL2101 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $9,334 $3,875 n/a
CL2101 # 03 Y:2021 03 2021 INSTALL TIMERS AND/OR THERMOSTATS $848 $800 n/a
CL2101 # 04 Y:2021 04 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,276 $500 n/a
CL2101 # 05 Y:2021 05 2021 INSTALL TIMERS AND/OR THERMOSTATS $1,761 $186 n/a
CL2017 # 01 Y:2020 01 2020 INSTALL OCCUPANCY SENSORS $206 $230 Implemented
CL2017 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,804 $2,100 Implemented
CL2017 # 03 Y:2020 03 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,093 $0 Not Implemented
CL2017 # 04 Y:2020 04 2020 INSTALL TIMERS AND/OR THERMOSTATS $1,387 $0 Implemented
CL2017 # 05 Y:2020 05 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,006 $789 Implemented
CL2016 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,588 $3,733 Implemented
CL2016 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $5,838 $656 Implemented
CL2016 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,376 $1,720 Implemented
CL2016 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,257 $43,750 Not Implemented
CL2016 # 05 Y:2020 05 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $967 $400 Not Implemented
CL2016 # 06 Y:2020 06 2020 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $797 $0 Implemented
CL2016 # 07 Y:2020 07 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $567 $0 Implemented
CL2016 # 08 Y:2020 08 2020 RECOVER WASTE HEAT FROM EQUIPMENT $4,055 $2,500 Implemented
CL2015 # 01 Y:2020 01 2020 MODIFY STARTUP/SHUTDOWN TIMES $7,855 $550 Not Implemented
CL2015 # 02 Y:2020 02 2020 USE OPTIMUM TEMPERATURE $17,243 $0 Not Implemented
CL2015 # 03 Y:2020 03 2020 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $53 $0 Not Implemented
CL2015 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,229 $4,600 Not Implemented
NC0654 # 01 Y:2020 01 2020 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $1,381,024 $8,000,000 Not Implemented
NC0654 # 02 Y:2020 02 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $15,030 $75,000 Not Implemented
NC0654 # 03 Y:2020 03 2020 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $11,303 $20,000 Not Implemented
NC0654 # 04 Y:2020 04 2020 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $1,543 $6,700 Not Implemented