IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,874

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0283 # 04 Y:2023 04 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,087 $0 n/a
UA0283 # 05 Y:2023 05 2023 PAY BILLS ON TIME TO AVOID LATE FEES $21,298 $0 n/a
UA0283 # 06 Y:2023 06 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $12,662 $6,036 n/a
UA0283 # 07 Y:2023 07 2023 INSTALL TIMERS AND/OR THERMOSTATS $14,473 $2,726 n/a
UA0283 # 08 Y:2023 08 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,686 $750 n/a
UA0283 # 09 Y:2023 09 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,911 $8,591 n/a
UA0283 # 10 Y:2023 10 2023 USE SYNTHETIC LUBRICANT $6,907 $21,930 n/a
UA0283 # 11 Y:2023 11 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,688 $31,108 n/a
IP0184 # 01 Y:2023 01 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $14,493 $0 Implemented
IP0184 # 02 Y:2023 02 2023 USE MINIMUM STEAM OPERATING PRESSURE $83,429 $20,365 Implemented
IP0184 # 03 Y:2023 03 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,667 $2,615 Implemented
IP0184 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,216 $17,960 Implemented
IP0184 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,142 $12,019 Implemented
UF0608 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $100,291 $322,608 n/a
UF0608 # 02 Y:2023 02 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,445 $25,640 n/a
UF0608 # 03 Y:2023 03 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,437 $3,636 n/a
UF0608 # 04 Y:2023 04 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,417 $9,340 n/a
UF0608 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,526 $10,560 n/a
UF0608 # 06 Y:2023 06 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,789 $7,200 n/a
UF0608 # 07 Y:2023 07 2023 UPGRADE CONTROLS ON COMPRESSORS $1,138 $5,400 n/a
IP0183 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,443 $37,653 Not Implemented
IP0183 # 02 Y:2023 02 2023 INCREASE AMOUNT OF CONDENSATE RETURNED $48,374 $55,000 Not Implemented
IP0183 # 03 Y:2023 03 2023 USE RADIANT HEATER FOR SPOT HEATING $8,695 $19,367 Not Implemented
IP0183 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $71,584 $212,913 Not Implemented
IP7008 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,274 $2,145 Not Implemented