Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,871
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0053 # 03 Y:2010 | 03 | 2010 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $3,000 | $10 | Implemented |
TT0053 # 04 Y:2010 | 04 | 2010 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $2,700 | $1,000 | Implemented |
TT0053 # 05 Y:2010 | 05 | 2010 | USE PHOTOCELL CONTROLS | $340 | $520 | Not Implemented |
UD0812 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,236 | $19,740 | Not Implemented |
UD0812 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,893 | $6,240 | Not Implemented |
UD0812 # 03 Y:2010 | 03 | 2010 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,148 | $0 | Not Implemented |
UD0812 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,589 | $1,000 | Not Implemented |
UD0812 # 05 Y:2010 | 05 | 2010 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $2,047 | $12,500 | Not Implemented |
UD0812 # 06 Y:2010 | 06 | 2010 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $14,040 | $16,000 | Not Implemented |
UD0812 # 07 Y:2010 | 07 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,750 | $21,000 | Not Implemented |
UD0812 # 08 Y:2010 | 08 | 2010 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,335 | $2,310 | Not Implemented |
UD0812 # 09 Y:2010 | 09 | 2010 | COVER OPEN TANKS | $4,280 | $3,600 | Not Implemented |
UD0812 # 10 Y:2010 | 10 | 2010 | OPTIMIZE PLANT POWER FACTOR | $1,963 | $5,000 | Not Implemented |
UD0812 # 11 Y:2010 | 11 | 2010 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $800 | $2,500 | Not Implemented |
UD0812 # 12 Y:2010 | 12 | 2010 | INSTALL AUTOMATIC STACK DAMPER | $20,826 | $200 | Not Implemented |
UD0812 # 13 Y:2010 | 13 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,114 | $70,000 | Not Implemented |
UD0812 # 14 Y:2010 | 14 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,930 | $10,000 | Not Implemented |
UD0812 # 15 Y:2010 | 15 | 2010 | INSTALL AUTOMATIC STACK DAMPER | $15,975 | $8,500 | Not Implemented |
UD0797 # 01 Y:2009 | 01 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $141,216 | $250,000 | Not Implemented |
UD0797 # 02 Y:2009 | 02 | 2009 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $61,511 | $5,000 | Not Implemented |
UD0797 # 03 Y:2009 | 03 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,489 | $48,750 | Implemented |
UD0797 # 04 Y:2009 | 04 | 2009 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $22,395 | $6,000 | Not Implemented |
UD0797 # 05 Y:2009 | 05 | 2009 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $23,393 | $75,000 | Not Implemented |
UD0797 # 06 Y:2009 | 06 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,034 | $1,000 | Implemented |
UD0797 # 07 Y:2009 | 07 | 2009 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,835 | $75,000 | Not Implemented |