IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,076

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1095 # 01 Y:2024 01 2024 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $252 $1,500 n/a
UD1095 # 02 Y:2024 02 2024 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $581 $10,500 n/a
UD1095 # 03 Y:2024 03 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,050 $0 n/a
UD1094 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $9,350 $130,000 n/a
UD1094 # 02 Y:2024 02 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $880 $0 n/a
UD1094 # 03 Y:2024 03 2024 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $342 $20,000 n/a
UD1093 # 01 Y:2024 01 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $13,379 $1,330 Not Implemented
UD1093 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,271 $772 Not Implemented
UD1093 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,247 $720 Not Implemented
UD1093 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,446 $9,639 Not Implemented
UD1093 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,522 $2,450 Implemented
UD1093 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,442 $953 Implemented
UD1093 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,360 $48,200 Not Implemented
UD1093 # 08 Y:2024 08 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,573 $48,200 Not Implemented
UD1093 # 09 Y:2024 09 2024 OPTIMIZE PLANT POWER FACTOR $13,480 $31,200 Not Implemented
UD1092 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $26,516 $0 Implemented
UD1092 # 02 Y:2024 02 2024 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $6,755 $0 Not Implemented
UD1092 # 03 Y:2024 03 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $16,477 $5,670 Not Implemented
UD1092 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $60,291 $0 Implemented
UD1092 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $23,052 $34,302 Not Implemented
WV0669 # 06 Y:2024 06 2024 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $6,200 $11,000 Not Implemented
WV0669 # 17 Y:2024 17 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $135 $363 Implemented
WV0669 # 16 Y:2024 16 2024 INSULATE BARE EQUIPMENT $357 $798 Implemented
WV0669 # 15 Y:2024 15 2024 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $397 $1,920 Not Implemented
WV0669 # 14 Y:2024 14 2024 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $843 $1,200 Implemented