Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26,104
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2503 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,078 | $1,600 | n/a |
UC2503 # 06 Y:2024 | 06 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $15,917 | $51,000 | n/a |
UC2503 # 07 Y:2024 | 07 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $531 | $2,870 | n/a |
UC2503 # 08 Y:2024 | 08 | 2024 | INSTALL OCCUPANCY SENSORS | $751 | $435 | n/a |
TT0327 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,321 | $0 | n/a |
TT0327 # 02 Y:2025 | 02 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,048 | $0 | n/a |
TT0327 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $998 | $120 | n/a |
TT0327 # 04 Y:2025 | 04 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,500 | $550 | n/a |
TT0327 # 05 Y:2025 | 05 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $39,392 | $20,000 | n/a |
TT0327 # 06 Y:2025 | 06 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,254 | $1,491 | n/a |
TT0327 # 07 Y:2025 | 07 | 2025 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $17,852 | $35,000 | n/a |
TT0327 # 08 Y:2025 | 08 | 2025 | OPTIMIZE PLANT POWER FACTOR | $8,101 | $31,875 | n/a |
TT0327 # 09 Y:2025 | 09 | 2025 | USE SOLAR HEAT FOR HEAT | $66,246 | $798,795 | n/a |
UU0267 # 01 Y:2025 | 01 | 2025 | OPTIMIZE PLANT POWER FACTOR | $3,730 | $6,750 | n/a |
UU0267 # 02 Y:2025 | 02 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,200 | $6,000 | n/a |
UU0267 # 03 Y:2025 | 03 | 2025 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $6,322 | $119,100 | n/a |
UU0267 # 04 Y:2025 | 04 | 2025 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,650 | $9,727 | n/a |
UU0267 # 05 Y:2025 | 05 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,456 | $3,600 | n/a |
UU0267 # 06 Y:2025 | 06 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,113 | $29,674 | n/a |
UU0267 # 07 Y:2025 | 07 | 2025 | USE AUTOMATIC FLOW CONTROL | $2,903 | $6,218 | n/a |
UU0267 # 08 Y:2025 | 08 | 2025 | USE MAGNETIC TECHNOLOGY TO TREAT WATER | $12,294 | $19,900 | n/a |
UF0627 # 01 Y:2025 | 01 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $19,980 | $20,761 | n/a |
UF0627 # 02 Y:2025 | 02 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $16,402 | $72,000 | n/a |
UF0627 # 03 Y:2025 | 03 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $8,759 | $32,640 | n/a |
UF0627 # 04 Y:2025 | 04 | 2025 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $5,567 | $9,248 | n/a |