IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,713

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0505 # 01 Y:2017 01 2017 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $715,231 $1,700,000 Not Implemented
UF0505 # 02 Y:2017 02 2017 REPLACE BOILER $152,736 $200,000 Implemented
UF0505 # 03 Y:2017 03 2017 INCREASE AMOUNT OF CONDENSATE RETURNED $18,902 $2,800 Implemented
UF0505 # 04 Y:2017 04 2017 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $13,763 $120 Implemented
UF0505 # 05 Y:2017 05 2017 INSTALL TURBULATORS $12,705 $7,500 Not Implemented
UF0505 # 06 Y:2017 06 2017 REPAIR AND ELIMINATE STEAM LEAKS $7,831 $1,081 Implemented
UF0505 # 07 Y:2017 07 2017 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $7,374 $4,000 Not Implemented
UF0505 # 08 Y:2017 08 2017 REPAIR AND ELIMINATE STEAM LEAKS $4,554 $1,592 Implemented
UF0504 # 01 Y:2017 01 2017 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $12,636 $39,000 Not Implemented
UF0504 # 02 Y:2017 02 2017 ADD AREA LIGHTING SWITCHES $2,381 $2,240 Not Implemented
UF0504 # 03 Y:2017 03 2017 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $1,236 $700 Not Implemented
UF0504 # 04 Y:2017 04 2017 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $352,554 $180,000 Not Implemented
UF0504 # 05 Y:2017 05 2017 INSTALL AN UNINTERUPTABLE POWER SUPPLY $15,187 $28,820 Not Implemented
UF0504 # 06 Y:2017 06 2017 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $9,360 $3,600 Not Implemented
UF0503 # 01 Y:2017 01 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $69,770 $7,000 Not Implemented
UF0503 # 02 Y:2017 02 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,043 $1,400 Not Implemented
UF0503 # 03 Y:2017 03 2017 IMPROVE COMBUSTION CONTROL CAPABILITY $9,797 $2,182 Not Implemented
UF0503 # 04 Y:2017 04 2017 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $4,014 $0 Not Implemented
UF0503 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $3,268 $0 Not Implemented
UF0503 # 06 Y:2017 06 2017 USE CONTINUOUS EQUIPMENT WHICH RETAINS PROCESS HEATING CONVEYORS WITHIN THE HEATED CHAMBER $1,188 $0 Not Implemented
UF0502 # 01 Y:2017 01 2017 ADJUST BURNERS FOR EFFICIENT OPERATION $292,994 $0 Not Implemented
UF0502 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,062 $2,182 Not Implemented
UF0502 # 03 Y:2017 03 2017 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $7,986 $0 Not Implemented
UF0502 # 04 Y:2017 04 2017 IMPROVE COMBUSTION CONTROL CAPABILITY $2,634 $0 Not Implemented
UF0502 # 05 Y:2017 05 2017 REDESIGN PROCESS $1,490 $1,800 Not Implemented