IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,377

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TS0022 # 01 Y:1985 01 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,270 $5,000 Not Implemented
TS0022 # 02 Y:1985 02 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $595 $0 Not Implemented
TS0022 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,325 $480 Not Implemented
TS0022 # 04 Y:1985 04 1985 INSTALL SET-BACK TIMERS $2,580 $1,000 Not Implemented
TS0022 # 05 Y:1985 05 1985 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $10,224 $3,000 Not Implemented
KU0157 # 01 Y:1985 01 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $19,738 $2,752 Not Implemented
KU0157 # 02 Y:1985 02 1985 IMPROVE LUBRICATION PRACTICES $1,569 $290 Implemented
KU0157 # 03 Y:1985 03 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,260 $4,000 Implemented
KU0157 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,889 $1,550 Implemented
KU0157 # 05 Y:1985 05 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $759 $1,016 Implemented
KU0157 # 06 Y:1985 06 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,893 $1,500 Implemented
KU0157 # 07 Y:1985 07 1985 RECOVER WASTE HEAT FROM EQUIPMENT $899 $1,480 Implemented
KU0157 # 08 Y:1985 08 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $357 $0 Implemented
KU0157 # 09 Y:1985 09 1985 INSTALL AUTOMATIC STACK DAMPER $745 $1,100 Implemented
OK0158 # 01 Y:1985 01 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $60 $0 Implemented
OK0158 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $161 $33 Implemented
OK0158 # 03 Y:1985 03 1985 INSTALL TIMERS AND/OR THERMOSTATS $93 $100 Not Implemented
OK0158 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $638 $180 Implemented
OK0158 # 05 Y:1985 05 1985 USE RADIANT HEATER FOR SPOT HEATING $1,375 $76 Implemented
OK0158 # 06 Y:1985 06 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,828 $3,400 Implemented
OK0159 # 01 Y:1985 01 1985 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $400 $0 Not Implemented
OK0159 # 02 Y:1985 02 1985 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $300 $0 Implemented
OK0159 # 03 Y:1985 03 1985 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $130 $130 Not Implemented
OK0159 # 04 Y:1985 04 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,480 $975 Implemented
OK0159 # 05 Y:1985 05 1985 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $165 $52 Implemented