IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,032

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0406 # 01 Y:1993 01 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,316 $3,168 Implemented
KU0406 # 02 Y:1993 02 1993 INSTALL OCCUPANCY SENSORS $494 $1,600 Not Implemented
KU0406 # 03 Y:1993 03 1993 COVER OPEN TANKS $1,525 $1,125 Implemented
KU0406 # 04 Y:1993 04 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $572 $489 Implemented
KU0406 # 05 Y:1993 05 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $560 $350 Not Implemented
KU0406 # 06 Y:1993 06 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $290 $30 Implemented
KU0406 # 07 Y:1993 07 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $116 $100 Not Implemented
KU0406 # 08 Y:1993 08 1993 AIR CONDITION ONLY SPACE NECESSARY $290 $590 Not Implemented
KU0405 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,867 $475 Implemented
KU0405 # 02 Y:1993 02 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $242 $200 Not Implemented
KU0405 # 03 Y:1993 03 1993 RECOVER WASTE HEAT FROM EQUIPMENT $156 $651 Not Implemented
KU0405 # 04 Y:1993 04 1993 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $2,618 $0 Not Implemented
KU0405 # 05 Y:1993 05 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $354 $520 Not Implemented
KU0405 # 06 Y:1993 06 1993 INSTALL OCCUPANCY SENSORS $571 $1,800 Not Implemented
KU0405 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $93 $340 Not Implemented
KU0405 # 08 Y:1993 08 1993 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $241 $0 Implemented
KU0404 # 01 Y:1993 01 1993 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $10,634 $11,960 Implemented
KU0404 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,539 $8,930 Implemented
KU0404 # 03 Y:1993 03 1993 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $663 $0 Implemented
KU0404 # 04 Y:1993 04 1993 USE OPTIMUM THICKNESS INSULATION $5,818 $3,721 Not Implemented
KU0404 # 05 Y:1993 05 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $1,106 $1,350 Implemented
KU0404 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $625 $780 Implemented
KU0404 # 07 Y:1993 07 1993 RECOVER WASTE HEAT FROM EQUIPMENT $518 $678 Implemented
KU0404 # 08 Y:1993 08 1993 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $186 $0 Implemented
KU0403 # 01 Y:1993 01 1993 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $997 $2,350 Not Implemented