IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,737

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0734 # 03 Y:2020 03 2020 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $20,357 $6,830 Not Implemented
OR0734 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,078 $220 Not Implemented
UU0164 # 01 Y:2020 01 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,252 $2,000 Not Implemented
UU0164 # 02 Y:2020 02 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $1,660 $500 Not Implemented
UU0164 # 03 Y:2020 03 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $865 $2,038 Not Implemented
UU0164 # 04 Y:2020 04 2020 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $750 $750 Not Implemented
UU0164 # 05 Y:2020 05 2020 USE RADIANT HEATER FOR SPOT HEATING $245 $540 Not Implemented
MZ0281 # 01 Y:2020 01 2020 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $22,302 $48,220 Not Implemented
MZ0281 # 02 Y:2020 02 2020 INSTALL SPECTRAL REFLECTORS / DELAMP $1,877 $396 Not Implemented
MZ0281 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $98 $250 Not Implemented
MZ0281 # 04 Y:2020 04 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,486 $720 Not Implemented
LE0495 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,065 $40 Not Implemented
LE0495 # 02 Y:2020 02 2020 INSTALL TIMERS AND/OR THERMOSTATS $2,183 $360 Not Implemented
LE0495 # 03 Y:2020 03 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,226 $270 Not Implemented
LE0495 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,360 $1,375 Not Implemented
LE0495 # 05 Y:2020 05 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $122 $360 Not Implemented
LE0495 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,587 $20,636 Not Implemented
MA0816 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $66,795 $292,241 Not Implemented
MA0816 # 02 Y:2020 02 2020 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $3,363 $3,000 Not Implemented
MA0816 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $917 $4,629 Implemented
MA0816 # 04 Y:2020 04 2020 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $493 $100 Not Implemented
IC0237 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,797 $2,350 Not Implemented
IC0237 # 02 Y:2020 02 2020 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $32,993 $2,764 Not Implemented
IC0237 # 03 Y:2020 03 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,125 $0 Not Implemented
IC0237 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,251 $2,864 Not Implemented