Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,642
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0009 # 01 Y:2007 | 01 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,272 | $0 | Implemented |
MZ0009 # 02 Y:2007 | 02 | 2007 | INSTALL OCCUPANCY SENSORS | $3,576 | $2,450 | Implemented |
MZ0009 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,922 | $1,150 | Implemented |
MZ0009 # 04 Y:2007 | 04 | 2007 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,310 | $0 | Implemented |
MZ0009 # 05 Y:2007 | 05 | 2007 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,927 | $2,500 | Implemented |
MZ0008 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,856 | $21,050 | Implemented |
MZ0008 # 02 Y:2007 | 02 | 2007 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $44,772 | $6,399 | Implemented |
MZ0008 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,289 | $800 | Implemented |
MZ0008 # 04 Y:2007 | 04 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $694 | $1,300 | Implemented |
MZ0008 # 05 Y:2007 | 05 | 2007 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $812 | $0 | Implemented |
MZ0008 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22 | $23 | Implemented |
MZ0007 # 01 Y:2007 | 01 | 2007 | COVER OPEN TANKS | $2,560 | $0 | Implemented |
MZ0007 # 02 Y:2007 | 02 | 2007 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $10,000 | $20,000 | Not Implemented |
MZ0007 # 03 Y:2007 | 03 | 2007 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $533 | $0 | Implemented |
MZ0007 # 04 Y:2007 | 04 | 2007 | DISCONNECT BALLASTS | $27,567 | $1,310 | Implemented |
MZ0007 # 05 Y:2007 | 05 | 2007 | INSTALL OCCUPANCY SENSORS | $5,535 | $3,250 | Implemented |
MZ0004 # 01 Y:2007 | 01 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,138 | $2,230 | Implemented |
MZ0004 # 02 Y:2007 | 02 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $18,457 | $3,412 | Not Implemented |
MZ0004 # 03 Y:2007 | 03 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,707 | $1,300 | Not Implemented |
MZ0004 # 04 Y:2007 | 04 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $184 | $150 | Implemented |
MZ0004 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,950 | $24,700 | Not Implemented |
MZ0004 # 06 Y:2007 | 06 | 2007 | DISCONNECT BALLASTS | $19,720 | $1,050 | Not Implemented |
MZ0004 # 07 Y:2007 | 07 | 2007 | INSTALL OCCUPANCY SENSORS | $6,900 | $2,950 | Not Implemented |
MZ0004 # 08 Y:2007 | 08 | 2007 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $56,125 | $0 | Not Implemented |
MZ0004 # 09 Y:2007 | 09 | 2007 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $4,600 | $0 | Implemented |