IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,130

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0006 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,007 $2,910 Not Implemented
NC0006 # 03 Y:1993 03 1993 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,860 $600 Implemented
NC0006 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,688 $5,010 Implemented
NC0006 # 05 Y:1993 05 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,245 $2,027 Not Implemented
NC0006 # 06 Y:1993 06 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,061 $120 Implemented
NC0006 # 07 Y:1993 07 1993 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,538 $6,000 Not Implemented
WI0183 # 01 Y:1993 01 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,073 $40,000 Not Implemented
WI0183 # 02 Y:1993 02 1993 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,157 $750 Not Implemented
WI0183 # 03 Y:1993 03 1993 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $3,359 $500 Not Implemented
WI0183 # 04 Y:1993 04 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $812 $0 Implemented
WI0183 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $474 $350 Not Implemented
WI0183 # 06 Y:1993 06 1993 CONSIDER THREE OR FOUR DAYS AROUND-THE-CLOCK OPERATION RATHER THAN ONE OR TWO SHIFTS PER DAY $385 $600 Implemented
WI0183 # 07 Y:1993 07 1993 RECOVER WASTE HEAT FROM EQUIPMENT $373 $640 Not Implemented
WI0183 # 08 Y:1993 08 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $296 $848 Not Implemented
WI0183 # 09 Y:1993 09 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $195 $0 Not Implemented
ME0109 # 01 Y:1993 01 1993 OPTIMIZE PLANT POWER FACTOR $14,260 $2,500 Not Implemented
ME0109 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,215 $4,300 Not Implemented
ME0109 # 03 Y:1993 03 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,548 $4,674 Implemented
ME0109 # 04 Y:1993 04 1993 RECOVER WASTE HEAT FROM EQUIPMENT $5,450 $9,000 Not Implemented
ME0111 # 01 Y:1993 01 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $980 $1,500 Implemented
ME0111 # 02 Y:1993 02 1993 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $2,120 $3,500 Not Implemented
ME0111 # 03 Y:1993 03 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,270 $2,000 Implemented
ME0111 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $590 $100 Implemented
ND0165 # 01 Y:1993 01 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $100 $0 Implemented
ND0165 # 02 Y:1993 02 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,650 $160 Implemented