IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0536 # 06 Y:1999 06 1999 IMPROVE SPACE COMFORT CONDITIONING $34,860 $75,000 n/a
MA0454 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,113 $11,700 Not Implemented
MA0454 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $5,776 $16,250 Not Implemented
MA0454 # 03 Y:1999 03 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $667 $2,675 Not Implemented
MA0453 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $60,085 $139,425 Not Implemented
MA0453 # 02 Y:1999 02 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $38,897 $96,900 Not Implemented
MA0453 # 03 Y:1999 03 1999 RECOVER WASTE HEAT FROM EQUIPMENT $19,476 $45,000 Not Implemented
MA0453 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,766 $19,425 Not Implemented
MA0453 # 05 Y:1999 05 1999 USE LESS WASTEFUL PACKAGING $8,714 $15,000 Not Implemented
MA0453 # 06 Y:1999 06 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,433 $10,115 Not Implemented
NV0144 # 01 Y:1999 01 1999 USE OPTIMUM THICKNESS INSULATION $418 $788 Not Implemented
NV0144 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $6,393 $5,533 Not Implemented
NV0144 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,668 $800 Implemented
MS0149 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $790 $263 Implemented
MS0149 # 02 Y:1999 02 1999 INSTALL TIMERS AND/OR THERMOSTATS $74 $119 Not Implemented
MS0149 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,504 $2,060 Implemented
MS0149 # 04 Y:1999 04 1999 USE OPTIMUM THICKNESS INSULATION $15,653 $9,593 Not Implemented
MS0148 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,990 $30,779 Not Implemented
MS0148 # 02 Y:1999 02 1999 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,778 $792 Not Implemented
MS0148 # 03 Y:1999 03 1999 USE PHOTOCELL CONTROLS $2,140 $1,195 Not Implemented
MS0148 # 04 Y:1999 04 1999 INSTALL TIMERS AND/OR THERMOSTATS $374 $222 Not Implemented
MS0148 # 05 Y:1999 05 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,136 $1,500 Implemented
MS0148 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,282 $2,577 Not Implemented
MS0148 # 07 Y:1999 07 1999 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,552 $18,900 Not Implemented
MS0148 # 08 Y:1999 08 1999 BURN WASTE OIL FOR HEAT $614 $2,274 Not Implemented