IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,961

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0322 # 05 Y:1995 05 1995 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,750 $500 Not Implemented
MA0322 # 06 Y:1995 06 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $684 $578 Not Implemented
MA0322 # 07 Y:1995 07 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $384 $945 Implemented
MA0322 # 08 Y:1995 08 1995 USE OTHER WASTE CONCENTRATION METHODS $61,150 $85,000 Implemented
MA0322 # 09 Y:1995 09 1995 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE $28,494 $57,500 Not Implemented
MA0321 # 01 Y:1995 01 1995 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $22,525 $60,000 Implemented
MA0321 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,118 $3,888 Not Implemented
MA0321 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,493 $23,880 Implemented
MA0317 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $14,534 $20,294 Not Implemented
MA0317 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,949 $0 Implemented
MA0317 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,082 $2,792 Not Implemented
MA0317 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,897 $1,188 Implemented
MA0317 # 05 Y:1994 05 1994 INSTALL OCCUPANCY SENSORS $1,701 $1,440 Not Implemented
MA0317 # 06 Y:1994 06 1994 REUSE / RECYCLE/ SELL PAPER PRODUCTS $28,200 $700 Not Implemented
MA0317 # 07 Y:1994 07 1994 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $4,700 $0 Implemented
MA0320 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $7,911 $8,698 Not Implemented
MA0320 # 02 Y:1994 02 1994 INSULATE BARE EQUIPMENT $8,056 $4,620 Not Implemented
MA0320 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,381 $700 Implemented
MA0320 # 04 Y:1994 04 1994 INSTALL OCCUPANCY SENSORS $533 $208 Not Implemented
MA0320 # 05 Y:1994 05 1994 DISTILL CONTAMINATED SOLVENTS FOR REUSE $4,164 $23,530 Not Implemented
MA0318 # 01 Y:1994 01 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,673 $4,305 Not Implemented
MA0318 # 02 Y:1994 02 1994 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $7,659 $3,520 Not Implemented
MA0318 # 03 Y:1994 03 1994 RECOVER WASTE HEAT FROM EQUIPMENT $3,319 $521 Implemented
MA0318 # 04 Y:1994 04 1994 OPTIMIZE PLANT POWER FACTOR $2,338 $4,349 Not Implemented
MA0318 # 05 Y:1994 05 1994 USE RADIANT HEATER FOR SPOT HEATING $1,100 $1,410 Not Implemented