IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26,341

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NT0035 # 03 Y:2025 03 2025 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,000 $5,300 n/a
NT0035 # 04 Y:2025 04 2025 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $150,000 $38,900 n/a
NT0035 # 05 Y:2025 05 2025 APPLY FOR INVESTMENT INCENTIVES $7,352 $5,000 n/a
NL0102 # 01 Y:2024 01 2024 UPGRADE OBSOLETE EQUIPMENT $88,713 $315,000 n/a
NL0102 # 02 Y:2024 02 2024 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $21,171 $6,200 n/a
NL0102 # 03 Y:2024 03 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,283 $250 n/a
NL0102 # 04 Y:2024 04 2024 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,253 $10,118 n/a
NL0102 # 05 Y:2024 05 2024 INSTALL SUB-METERING EQUIPMENT $1,237 $1,850 n/a
NL0102 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,130 $1,000 n/a
NL0102 # 07 Y:2024 07 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $882 $802 n/a
WV0672 # 01 Y:2024 01 2024 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $73,416 $271,368 Not Implemented
WV0672 # 02 Y:2024 02 2024 USE EVAPORATION TO CONCENTRATE MATERIAL $24,278 $31,216 Not Implemented
WV0672 # 03 Y:2024 03 2024 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $20,948 $26,406 Not Implemented
WV0672 # 04 Y:2024 04 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,264 $9,760 Not Implemented
WV0672 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,087 $759 Implemented
WV0672 # 06 Y:2024 06 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,489 $5,659 Implemented
WV0672 # 07 Y:2024 07 2024 UPGRADE CONTROLS ON COMPRESSORS $3,058 $6,936 Not Implemented
WV0672 # 08 Y:2024 08 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,640 $5,016 Implemented
WV0672 # 09 Y:2024 09 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,102 $753 Not Implemented
WV0672 # 10 Y:2024 10 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $797 $1,579 Implemented
WV0672 # 11 Y:2024 11 2024 OPTIMIZE PLANT POWER FACTOR $596 $2,964 Not Implemented
WV0672 # 12 Y:2024 12 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $401 $38 Implemented
WV0672 # 13 Y:2024 13 2024 INSTALL OCCUPANCY SENSORS $334 $984 Implemented
UF0623 # 01 Y:2024 01 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $21,088 $3,402 n/a
UF0623 # 02 Y:2024 02 2024 PREHEAT COMBUSTION AIR WITH WASTE HEAT $11,057 $4,000 n/a