Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,737
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0180 # 09 Y:2020 | 09 | 2020 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $610 | $900 | Implemented |
UD1014 # 01 Y:2020 | 01 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,326 | $0 | Not Implemented |
UD1014 # 02 Y:2020 | 02 | 2020 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $45,294 | $7,500 | Not Implemented |
UD1014 # 03 Y:2020 | 03 | 2020 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $23,635 | $0 | Not Implemented |
UD1014 # 04 Y:2020 | 04 | 2020 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $15,013 | $21,000 | Not Implemented |
UD1014 # 05 Y:2020 | 05 | 2020 | INSULATE BARE EQUIPMENT | $28,500 | $18,326 | Implemented |
UD1014 # 06 Y:2020 | 06 | 2020 | INSULATE BARE EQUIPMENT | $4,569 | $309 | Not Implemented |
UD1014 # 07 Y:2020 | 07 | 2020 | INSULATE BARE EQUIPMENT | $1,509 | $2,357 | Not Implemented |
UD1014 # 08 Y:2020 | 08 | 2020 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $6,203 | $7,500 | Not Implemented |
UD1014 # 09 Y:2020 | 09 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $4,307 | $10,000 | Not Implemented |
UD1014 # 10 Y:2020 | 10 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $2,657 | $1,120 | Not Implemented |
UD1014 # 11 Y:2020 | 11 | 2020 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,972 | $5,000 | Not Implemented |
UD1014 # 12 Y:2020 | 12 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,907 | $28,900 | Not Implemented |
UD1014 # 13 Y:2020 | 13 | 2020 | INSTALL OCCUPANCY SENSORS | $3,028 | $10,386 | Not Implemented |
UD1014 # 14 Y:2020 | 14 | 2020 | INSTALL OCCUPANCY SENSORS | $594 | $1,213 | Not Implemented |
NC0648 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,352 | $169,512 | Implemented |
NC0648 # 02 Y:2020 | 02 | 2020 | INSTALL OCCUPANCY SENSORS | $7,874 | $10,949 | Implemented |
NC0648 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $251 | $75 | Implemented |
NC0648 # 04 Y:2020 | 04 | 2020 | INSULATE BARE EQUIPMENT | $907 | $1,200 | Implemented |
TR0023 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,791 | $1,500 | Implemented |
TR0023 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,401 | $9,785 | Implemented |
TR0023 # 03 Y:2020 | 03 | 2020 | METER WASTE WATER | $7,020 | $1,511 | Implemented |
CL2004 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,961 | $27,670 | Implemented |
CL2004 # 02 Y:2020 | 02 | 2020 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $79,699 | $350,000 | Implemented |
CL2004 # 03 Y:2020 | 03 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $39,256 | $196,000 | Implemented |