IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0125 # 05 Y:1994 05 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,699 $100 Not Implemented
MO0125 # 06 Y:1994 06 1994 ADJUST VENTS TO MINIMIZE ENERGY USE $7,415 $4,046 Not Implemented
MO0125 # 07 Y:1994 07 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,490 $4,990 Implemented
MO0125 # 08 Y:1994 08 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,568 $995 Not Implemented
MO0125 # 09 Y:1994 09 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $907 $2,422 Not Implemented
MO0125 # 10 Y:1994 10 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,687 $5,391 Implemented
MO0125 # 11 Y:1994 11 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $719 $330 Implemented
OD0008 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,410 $800 Implemented
OD0008 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,213 $2,774 Not Implemented
OD0008 # 03 Y:1994 03 1994 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $2,718 $3,000 Implemented
OD0008 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,223 $4,432 Implemented
MO0125 # 01 Y:1994 01 1994 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $72,601 $300 Implemented
MO0125 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,702 $16,870 Not Implemented
MO0125 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,960 $1,057 Not Implemented
SF0033 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,337 $6,224 Not Implemented
SF0033 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $449 $206 Not Implemented
SF0033 # 03 Y:1994 03 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,575 $6,000 Not Implemented
SF0033 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,548 $900 Implemented
SF0033 # 05 Y:1994 05 1994 USE SYNTHETIC LUBRICANT $185 $0 Implemented
KG0005 # 01 Y:1994 01 1994 USE DEMAND CONTROLLER OR LOAD SHEDDER $56,492 $1,260 Implemented
KG0005 # 02 Y:1994 02 1994 INSTALL TIMERS AND/OR THERMOSTATS $6,211 $2,900 Implemented
KG0005 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,505 $43,160 Implemented
KG0005 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,345 $1,125 Implemented
KG0005 # 05 Y:1994 05 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,042 $2,500 Implemented
KG0005 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,148 $465 Implemented