IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0213 # 01 Y:1994 01 1994 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $4,449 $0 Implemented
WI0213 # 02 Y:1994 02 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,383 $2,000 Implemented
WI0213 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,758 $4,000 Not Implemented
WI0213 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $669 $1,713 Implemented
WI0213 # 05 Y:1994 05 1994 INSTALL OCCUPANCY SENSORS $663 $600 Implemented
WI0213 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,597 $1,000 Not Implemented
WI0213 # 07 Y:1994 07 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $501 $640 Implemented
UF0097 # 01 Y:1994 01 1994 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,917 $0 Not Implemented
UF0097 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,389 $4,359 Not Implemented
UF0097 # 03 Y:1994 03 1994 INSTALL SPECTRAL REFLECTORS / DELAMP $621 $888 Not Implemented
UF0097 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,231 $17,559 Implemented
UF0097 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $873 $3,458 Not Implemented
UF0097 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,478 $1,000 Implemented
UF0097 # 07 Y:1994 07 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,828 $10,000 Not Implemented
UF0097 # 08 Y:1994 08 1994 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $33,331 $101,600 Not Implemented
UF0097 # 09 Y:1994 09 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,666 $9,238 Implemented
TN0523 # 01 Y:1994 01 1994 INSTALL TIMERS AND/OR THERMOSTATS $7,494 $1,620 Not Implemented
TN0523 # 02 Y:1994 02 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,681 $4,140 Not Implemented
TN0523 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,198 $520 Implemented
TN0523 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,185 $870 Implemented
TN0523 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $909 $221 Not Implemented
TN0523 # 06 Y:1994 06 1994 USE SYNTHETIC LUBRICANT $906 $0 Implemented
TN0523 # 07 Y:1994 07 1994 INSULATE BARE EQUIPMENT $376 $65 Implemented
TN0523 # 08 Y:1994 08 1994 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $21,222 $16,000 Not Implemented
MA0315 # 01 Y:1994 01 1994 BURN A LESS EXPENSIVE GRADE OF FUEL $10,053 $33,627 Not Implemented