IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,573

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0296 # 08 Y:2024 08 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $271,456 $1,202,972 Not Implemented
IC0296 # 09 Y:2024 09 2024 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $62,421 $0 Implemented
IC0296 # 10 Y:2024 10 2024 REPLACE BOILER $112,681 $127,793 Not Implemented
IC0296 # 11 Y:2024 11 2024 INSULATE BARE EQUIPMENT $2,446 $608 Implemented
IC0296 # 12 Y:2024 12 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,022 $1,150 Implemented
IC0296 # 13 Y:2024 13 2024 REPAIR OR REPLACE STEAM TRAPS $7,154 $1,011 Implemented
IC0295 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,690 $3,413 Implemented
IC0295 # 02 Y:2024 02 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,497 $558 Implemented
IC0295 # 03 Y:2024 03 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $13,248 $0 Implemented
IC0295 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,828 $7,539 Not Implemented
IC0295 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,221 $6,343 Not Implemented
IC0295 # 06 Y:2024 06 2024 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $16,247 $16,893 Not Implemented
IC0295 # 07 Y:2024 07 2024 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $843 $490 Implemented
IP0180 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,258 $0 Implemented
IP0180 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,158 $32 Implemented
IP0180 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,666 $1,830 Implemented
IP0180 # 04 Y:2023 04 2023 USE FOG NOZZLES / SPRAY RINSING INSTEAD OF IMMERSION RINSING $4,518 $5,490 Not Implemented
IP0180 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,597 $3,719 Not Implemented
IP0180 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,621 $36,055 Implemented
IP0180 # 07 Y:2023 07 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $6,444 $26,075 Not Implemented
IP0179 # 01 Y:2023 01 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $471 $0 Not Implemented
IP0179 # 02 Y:2023 02 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,855 $0 Not Implemented
IP0179 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $19,788 $345 Not Implemented
IP0179 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $814 $9 Not Implemented
IP0179 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,534 $182 Not Implemented