IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,737

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0162 # 04 Y:2020 04 2020 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $328 $1,141 Implemented
IC0234 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,669 $32,097 Implemented
IC0234 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,418 $1,107 Implemented
IC0234 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,059 $3,380 Implemented
IC0234 # 04 Y:2020 04 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,075 $3,800 Implemented
LS2004 # 01 Y:2020 01 2020 INSTALL TIMERS AND/OR THERMOSTATS $2,617 $0 Implemented
LS2004 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,091 $25 Not Implemented
LS2004 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,899 $0 Implemented
LS2004 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $10,389 $3,245 Not Implemented
LS2004 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,227 $0 Implemented
MA0812 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $228,815 $892,794 Not Implemented
MA0812 # 02 Y:2020 02 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $56,847 $3,250 Not Implemented
MA0812 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,615 $32,940 Implemented
MA0812 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,190 $5,960 Implemented
MA0812 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,774 $16,650 Implemented
MA0812 # 06 Y:2020 06 2020 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $8,604 $500 Not Implemented
AS0479 # 01 Y:2020 01 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $20,215 $200 Implemented
AS0479 # 02 Y:2020 02 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $15,892 $111,826 Not Implemented
AS0479 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,108 $6,016 Implemented
AS0479 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,979 $1,639 Implemented
AS0479 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,834 $330 Implemented
AS0479 # 06 Y:2020 06 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,794 $7,400 Implemented
AS0479 # 07 Y:2020 07 2020 INSTALL OCCUPANCY SENSORS $1,596 $4,600 Not Implemented
AS0479 # 08 Y:2020 08 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $60 $281 Not Implemented
MA0813 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $60,067 $253,810 Not Implemented