IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,738

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0416 # 02 Y:1993 02 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,003 $7,379 Not Implemented
OK0416 # 03 Y:1993 03 1993 RECOVER WASTE HEAT FROM EQUIPMENT $300 $1,012 Not Implemented
OK0416 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $804 $1,400 Not Implemented
OK0416 # 05 Y:1993 05 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $211 $0 Not Implemented
OK0417 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,331 $180 Implemented
OK0417 # 02 Y:1993 02 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,551 $0 Not Implemented
OK0417 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,614 $5,045 Implemented
OK0417 # 04 Y:1993 04 1993 INSTALL SET-BACK TIMERS $1,428 $1,200 Implemented
OK0417 # 05 Y:1993 05 1993 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $922 $790 Implemented
OK0417 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $833 $2,567 Not Implemented
OK0417 # 07 Y:1993 07 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $827 $946 Implemented
OK0417 # 08 Y:1993 08 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $767 $0 Implemented
OK0417 # 09 Y:1993 09 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $447 $0 Implemented
AR0011 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,614 $2,225 Implemented
AR0011 # 02 Y:1993 02 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $13,006 $1,690 Not Implemented
AR0011 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,990 $250 Implemented
AR0011 # 04 Y:1993 04 1993 REDESIGN PROCESS $50,000 $145,000 Not Implemented
AR0011 # 05 Y:1993 05 1993 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,207 $1,000 Not Implemented
AR0010 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,459 $1,483 Implemented
AR0010 # 02 Y:1993 02 1993 REPAIR AND ELIMINATE STEAM LEAKS $8,251 $1,400 Implemented
AR0010 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,539 $16,518 Implemented
AR0010 # 04 Y:1993 04 1993 INSULATE BARE EQUIPMENT $85,106 $13,998 Not Implemented
AR0010 # 05 Y:1993 05 1993 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,412 $30 Implemented
AR0009 # 01 Y:1993 01 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,253 $990 Implemented
AR0009 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,429 $2,535 Implemented