IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,130

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0073 # 08 Y:1993 08 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $782 $2,352 Not Implemented
UF0073 # 09 Y:1993 09 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $488 $700 Implemented
ND0157 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,365 $2,297 Implemented
ND0157 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $368 $864 Not Implemented
ND0157 # 03 Y:1993 03 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $657 $600 Not Implemented
ND0157 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $352 $300 Implemented
ND0157 # 05 Y:1993 05 1993 INSULATE BARE EQUIPMENT $98 $101 Not Implemented
ND0157 # 06 Y:1993 06 1993 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $880 $125 Implemented
ND0157 # 07 Y:1993 07 1993 INSULATE BARE EQUIPMENT $427 $2,355 Not Implemented
ND0156 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,182 $2,631 Not Implemented
ND0156 # 02 Y:1993 02 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,235 $500 Not Implemented
ND0156 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,433 $1,025 Not Implemented
ND0156 # 04 Y:1993 04 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $580 $1,280 Not Implemented
ND0156 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $104 $112 Not Implemented
UD0405 # 01 Y:1993 01 1993 UPGRADE CONTROLS ON COMPRESSORS $2,213 $100 Implemented
UD0405 # 02 Y:1993 02 1993 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $2,743 $2,000 Implemented
UD0405 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,176 $2,511 Implemented
UD0405 # 04 Y:1993 04 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $548 $1,000 Implemented
TN0497 # 01 Y:1993 01 1993 INSULATE BARE EQUIPMENT $13,208 $375 Implemented
TN0497 # 02 Y:1993 02 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,460 $3,241 Implemented
TN0497 # 03 Y:1993 03 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,201 $0 Not Implemented
TN0497 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,228 $1,370 Not Implemented
TN0497 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,194 $914 Not Implemented
TN0497 # 06 Y:1993 06 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,039 $800 Not Implemented
UF0067 # 01 Y:1993 01 1993 USE POWER DURING OFF-PEAK PERIODS $3,864 $0 Not Implemented