IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,871

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL0131 # 02 Y:1995 02 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $252 $0 Implemented
UL0131 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $246 $40 Implemented
UL0131 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $509 $775 Not Implemented
UL0131 # 05 Y:1995 05 1995 OPTIMIZE PLANT POWER FACTOR $3,704 $2,293 Not Implemented
UL0131 # 06 Y:1995 06 1995 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,259 $200 Implemented
UL0131 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,260 $14,230 Not Implemented
UL0131 # 08 Y:1995 08 1995 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $30,600 $330 Implemented
UL0131 # 09 Y:1995 09 1995 RECOVER AND REUSE WASTE MATERIAL $18,600 $0 Implemented
UL0131 # 10 Y:1995 10 1995 USE LESS WASTEFUL PACKAGING $28,800 $27,200 Not Implemented
UL0130 # 01 Y:1995 01 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $922 $0 Not Implemented
UL0130 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,808 $4,595 Not Implemented
UL0130 # 03 Y:1995 03 1995 OPTIMIZE PLANT POWER FACTOR $11,418 $5,400 Not Implemented
UL0130 # 04 Y:1995 04 1995 OPTIMIZE PLANT POWER FACTOR $17,564 $10,120 Not Implemented
UL0130 # 05 Y:1995 05 1995 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $4,704 $20,700 Not Implemented
UL0128 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,956 $1,721 n/a
UL0128 # 02 Y:1995 02 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $687 $1,000 n/a
UL0128 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,597 $2,650 n/a
UL0128 # 04 Y:1995 04 1995 OPTIMIZE PLANT POWER FACTOR $5,045 $6,400 n/a
UL0128 # 05 Y:1995 05 1995 OPTIMIZE PLANT POWER FACTOR $7,271 $6,758 n/a
UL0127 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,455 $40 Implemented
UL0127 # 02 Y:1995 02 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,913 $2,000 Implemented
UL0127 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $37,934 $59,260 Not Implemented
UL0126 # 01 Y:1995 01 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $34,745 $2,000 Implemented
UL0126 # 02 Y:1995 02 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,272 $40 Not Implemented
UL0126 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,595 $40 Implemented